OMEGA Drivers
System Description
System Overview |
Laser Drivers |
Shot Procedures
Section | Document Name | Procedure ID |
---|---|---|
LDO SHOT PREPARATION CHECKLISTS | Laser Drivers Operator’s Shot Preparation Checklist | S-OM-P-080 |
Laser Drivers Operator’s Qualification Checklist | S-OM-P-162 | |
LDO NON-PROPAGATING SHOT CHECKLISTS (TYPE 1-2) | Driver Non-Prop: LARA Warm-Up / Charge & Dump / Charge & Fire (all) / LARA Hold-Off (Type 1) |
S-OM-P-081 |
Non-Propagating (Type 2) | S-OM-P-091 | |
LDO DRIVER SHOT CHECKLISTS (TYPE 1) | Driver Calorimetry Checklist | S-OM-P-147 |
UV Fiducial Shots (Type 1) | S-OM-P-086 | |
LDO INJECTION SHOT PROCEDURES (TYPE 3-7) | Injection Shot Checklist – (Types 4-7) | S-OM-P-146 |
SSG Series Shot – SSD Driver (Type 4) | S-OM-P-095 | |
LDT Shot Procedures (Type 1-7) | Laser Drivers Technician’s Pre & Post-Shot Checklist | S-OM-P-096 |
LDO SECURING | Laser Drivers Operator’s Securing Checklist | S-OM-P-098 |
Startup
Section | Document Name | Procedure ID |
---|---|---|
HTS startup and shutdown | S-OM-P-118 | |
RIM Bypass Procedure | S-OM-P-114 | |
Unplanned Power Outage Recovery Procedure | S-OM-P-156 | |
Planned Power Outage Shut Down Procedure | S-OM-P-157 | |
Planned Power Outage Recovery Procedure | S-OM-P-158 | |
DER | Pulse-shape Analysis Startup Shutdown | S-OM-P-112 |
MIFEDS Safety Relay Installation and Removal | S-OM-P-115 | |
MIFEDS Post-Shot Recovery | S-OM-P-124 | |
IFES Startup and Shutdown | S-OM-P-123 | |
IFES Pulse Shape Setup with AWG | S-OM-P-188 | |
AWG Quick Pulse Shape Testing Guide (Quick PSR) | S-OM-P-197 | |
Pulse Shape Setup, Multiple Pulse Driver Line | S-OM-P-191 | |
Phoenix/MPD beam Combiner installation | S-OM-P-192 | |
PGR | LDT SSD Mod 1 Phase Adjustment | T-AD-P-062 |
SSD Phase Modulator Startup and Shutdown | S-OM-P-121 | |
OMEGA Diode-Pumped Regen Startup and Shutdown | S-OM-P-127 | |
SSD Synchronization Spectrometer Operation (SSD SYNC) | S-OM-P-196 | |
Driverline | LARA Startup | S-OM-P-122 |
Pre-Pulse Contrast Startup and Shutdown | S-OM-P-126 | |
NEMS (Fiducial) | Fiducial Startup and Shutdown | S-OM-P-113 |
Maintenance
Section | Document Name | Procedure ID |
---|---|---|
LASER DRIVER SUBSYSTEM PROCEDURES | Check for Ground Loops | S-SM-P-002 |
12GHz Agilent DSO91204A Calibration Procedure (SSD/BL) | S-SM-P-397 | |
12 GHz Keysight Scope Calibration (PHX/DL) | S-SM-P-397 | |
TMPS Contrast Measurement | S-SM-P-426 | |
TMPS Switch Voltage Calibration | S-SM-P-427 | |
PGR/DER HVAC Check | S-SM-P-081 | |
PULSE SHAPING PROCEDURES | Modulator Calibration (MODCAL) | S-SM-P-004 |
Modulator Calibration (MINCAL) | S-SM-P-005 | |
Koheras Output Power | S-SM-P-009 | |
IFES Fiber Amplifier Pump Diode Efficiency | S-SM-P-011 | |
Measure Square Pulse Distortion | S-SM-P-399 | |
Weekly AWG Synchronization | S-SM-P-420 | |
AWG to System T-0 Timing Adjustment | S-SM-P-418 | |
TMPS Fiber Amplifier Pump Diode Efficiency | S-SM-P-011 | |
REGEN PROCEDURES | Check Diode Pumped Regen Settings | S-SM-P-013 |
DPR Cavity Alignment Check | S-SM-P-015 | |
Check Regen Timing | S-SM-P-016 | |
Check Isolation Contrast | S-SM-P-017 | |
Check Regen Output Energy | S-SM-P-018 | |
Check Pockels Cell Voltages | S-SM-P-019 | |
Driver Spatial Profile & Beam Size Check | S-SM-P-022 | |
Large Aperture PC Driver Voltage Check | S-SM-P-023 | |
Regen Energy Calibration | S-SM-P-025 | |
Beam Timing Support | S-SM-P-027 | |
Check Regen Switch-Out Timing | S-SM-P-389 | |
Check Regen Switchout Timing Dual Crystal Pockels Cell | S-SM-P-424 | |
LARA PROCEDURES | LARA Centering Diagnostic Alignment Check | S-SM-P-028 |
Monthly LARA Alignment | S-SM-P-029 | |
Check LARA Ring Pockels Cell Timing | S-SM-P-030 | |
Check LARA Isolation Pockels Cell Timing | S-SM-P-031 | |
LARA Ring Contrast Measurement | S-SM-P-032 | |
Driverline Energy Calibration | S-SM-P-033 | |
SSD Critical Mirror Alignment | S-SM-P-387 | |
LARA Hold-Off Test | S-SM-P-034 | |
LARA Pockels Cell Wedge Requirements | T-DN-M-001 | |
SPATIAL FILTER PROCEDURES | Spatial Filter Pinhole Visual Inspection | S-SM-P-035 |
LARA Spatial Filter Pinhole Centering | S-SM-P-037 | |
Check Spatial Filter Pinhole Centering | S-SM-P-038 | |
Check Spatial Filter Drive Belts | S-SM-P-078 | |
Optics Procedures | Inspect & Clean Optics | S-SM-P-039 |
SMOOTHING BY SPECTRAL DISPERSION PROCEDURES | Check and Adjust SSD Modulation | S-SM-P-040 |
SSD Modulator Tuning (Mod1, Mod2) | S-SM-P-041 | |
Halfwave Voltage Check on FID Pulser (SSD Slicer) | S-SM-P-042 | |
Check SSD Slicer Timing | S-SM-P-388 | |
DRIVERLINE PROCEDURES | 64 mm Amplifier Faraday Rotator Contrast Measurement | S-SM-P-043 |
Backlighter Faraday Rotator Contrast Measurement | S-SM-P-046 | |
Large Aperture PC Driver Replacement Checklist | S-SM-P-401 | |
Output Quality Procedures | Output Shear/Collimation Check (at A-Splitter) | S-SM-P-045 |
FIDUCIAL PROCEDURES | UV Fiducial Fiber Output Energy Measurement | S-SM-P-051 |
Weekly UV Fiducial Check | S-SM-P-380 | |
Verify Fiducial ODR Timing | S-SM-P-398 | |
TIMING PROCEDURES | System-Wide Crate Reset | S-SM-P-001 |
Master Timing Generator Reset | S-SM-P-161 | |
RFG Signal Level Check | S-SM-P-400 |
Support
Document Name | Procedure ID |
---|---|
IFES Pulse Shape Setup With ACSL | S-OM-P-125 |
IFES Pulse Shape Setup With AWG | S-OM-P-188 |
AWG Quick Pulse Shape Testing Guide (Quick PSR) | S-OM-P-197 |
Pulse Shape Setup, Multiple Pulse Driverline | S-OM-P-191 |
Phoenix/MPD Beam Combiner Installation | S-OM-P-192 |
Multiple Pulse Driverline Alignment Procedure | S-OM-P-449 |
Weekly AWG Synchronization | S-SM-P-420 |
Measure Square Pulse Distortion | S-SM-P-399 |
Check and Adjust SSD Modulation | S-SM-P-040 |
LDT SSD Mod 1 Phase Adjustment | T-AD-P-062 |
SSD Synchronization Spectrometer Operation (SSD SYNC) | S-OM-P-196 |
MIFEDS Installation and Removal | S-OM-P-115 |
MIFEDS Post Shot Recovery | S-OM-P-124 |
RIM bypass | S-OM-P-114 |
Unplanned Power Outage Recovery Procedure | S-OM-P-156 |
Planned Power Outage Shutdown Procedure | S-OM-P-157 |
Planned Power Outage Recovery Procedure | S-OM-P-158 |