OMEGA EP Building Construction Time Lapse Movies

Building Construction

Time-lapse presentation of the OMEGA EP construction site.
The movie begins in July 2003 and shows progression up until the building dedication in May 2005.

Concrete Pour

Time-lapse movie of the concrete pour for the OMEGA EP laser bay floor. On 25 March 2004, 1963 cubic yards (~8,000,000 lbs.,~1500 cubic metres; ~3,600,000 kg) of concrete was poured in a single day.