OMEGA Experimental Operations
System Description
Document Name | Procedure ID |
---|---|
OMEGA System Operations Manual Volume I–System Description | S-AA-M-12 |
Omega Target Positioning System Descriptions | S-AA-M-024 |
OMEGA Target Viewing System System Description | S-AA-M-023 |
Target Chamber Recovery System Refresher Presentation | Q-TR-M-009 |
Target Chamber Recovery System Description | |
Experimental Diagnostics | |
Targets and Target Fabrication |
Shot Procedures
Section | Document Name | Procedure ID |
---|---|---|
ESO | Omega Type 5 and EP Type 7 Shot Checklist | S-OM-M-008 |
Target Shot Procedure for Ambient Temp Targets | S-OM-M-009 | |
Target Shot Procedure for Spherical Cryo | S-OM-M-010 | |
Target Shot Procedure for Planar MC (normal pull) | S-OM-M-011 | |
Target Shot procedure for Planar MC (Shroud Parked) | S-OM-M-059 | |
Target Shot Procedure for Planar MC (no shroud) | S-OM-M-063 | |
EST | Omega Target Bay Sweep Checklist | S-OM-M-064 |
Shot Preparation | ESO Shot Preparation Checklist | S-OM-M-007 |
Securing | ESO Securing Checklist | S-OM-M-065 |
Startup
Section | Document Name | Procedure ID |
---|---|---|
Power Outage | Planned Power Outage Shutdown Procedure | S-OM-P-003 |
Planned Power Recovery Procedure | S-OM-P-004 | |
Unplanned Power Outage Recovery Procedure | S-OM-P-005 | |
Vacuum Systems | Simplicity Vacuum Controls GUI (CIMVAC) Users Manual | D-ES-K-634 |
Pump House Operations | S-OM-P-100 | |
Target Chamber Vacuum Operations | S-OM-P-101 | |
Omega Beam Transfer Tube Vacuum Operations | S-OM-P-102 | |
Target Positioning System Operations | S-OM-P-103 | |
Tritium | Diagnostic Tritium Operations | S-OM-P-104 |
TVS & associated | Target Viewing System | S-OM-P-105 |
HSvideo Camera | S-OM-P-106 | |
Cryo Shroud Sequencing and Target Detection Systems | S-OM-P-107 | |
Cryo | Upper Pylon Procedures | S-OM-P-108 |
Cryopump Regeneration | S-OM-P-109 | |
Cryo Shot Preparation Checklist | S-OM-P-144 | |
OMEGA EP | OAPI/M | S-OM-P-119 |
PAD/FSM | S-OM-P-149 | |
Misc. | OMEGA Target Bay Elevator Operating Procedure | S-OM-P-152 |
OMEGA Scintillation Counter Operation Procedure | S-OM-P-159 | |
OMEGA Target Bay 10-Ton Overhead Crane Operating Procedure | S-OM-P-187 | |
S.W.I.S.S. Activation Procedure | S-OM-P-201 |
Troubleshooting
Section | Document Name | Procedure ID |
---|---|---|
Misc | PLC Restart Procedure – Fixed Diagnostics | S-TS-P-002 |
Misc | TIM Controls Troubleshooting Guide | S-TS-P-004 |
Misc | LIM Control System Troubleshooting Guide | D-LM-M-239 |
Maintenance
Section | Document Name | Procedure ID |
---|---|---|
Personnel Safety Procedures | Bioassay | S-SM-P-113 |
Filter Mask Fit Check | S-SM-P-146 | |
OMEGA Target Chamber Entry Procedure | S-SM-P-395 | |
Radiation Related Procedures | Recover Target Debris from TC Floor | S-SM-P-054 |
Sample Target Chamber Environment for Beryllium | S-SM-P-055 | |
Target Chamber Alpha Swipe | S-SM-P-056 | |
Assay Exhaust Sample Activity | S-SM-P-071 | |
Confirm Operation of Overhoff Tritium Air Sampler | S-SM-P-072 | |
Replace Overhoff TASC Pump & Rotameter / Calibrate Flow | S-SM-P-073 | |
Inspect Overhoff TASC Dust Filter | S-SM-P-074 | |
Shield Monitors | S-SM-P-105 | |
Target Chamber Activation | S-SM-P-106 | |
Target Bay Activation | S-SM-P-107 | |
Surface Contamination Survey | S-SM-P-108 | |
TIM Dry Box Surface Contamination Survey | S-SM-P-109 | |
TIM Radiation Survey | S-SM-P-110 | |
TPS-2 Radiation Survey after DT Campaign | S-SM-P-111 | |
Radioactive Material Inventory Audit | S-SM-P-112 | |
Ludlum Model 3 Geiger Counter | S-SM-P-118 | |
Overhoff 7000 SBAyC Tritium Monitor | S-SM-P-119 | |
Ludlum Model 9 Ion Counter | S-SM-P-120 | |
Ludlum Model 9 Inspect/Replace Desiccant Packages | S-SM-P-121 | |
Non-Burnable Solid Radiation Waste Disposal | S-SM-P-445 | |
Target Bay Be and Tritium Survey | S-SM-P-440 | |
Tritium Decontamination | S-SM-P-451 | |
Exhaust Stack Procedures | Verify Stack Flowrate | S-SM-P-069 |
Calibrate Flowmeter | S-SM-P-070 | |
Target Chamber Vacuum Subsystem Procedures | Inspect Viewing Window for Potential Mechanical Failures | S-SM-P-078 |
TC Vacuum Gauge Calibration Check | S-SM-P-058 | |
EH1200 Blower Oil Levels | S-SM-P-059 | |
EH1200 Blower Pump Connections | S-SM-P-060 | |
EH1200 Blower Oil Change | S-SM-P-061 | |
GV120 Gearbox Oil Level | S-SM-P-062 | |
GV120 Pipelines and Connections | S-SM-P-063 | |
GV120 Gearbox Oil & Sight-Glasses | S-SM-P-064 | |
GV120 Relubricate Rotor Bearings | S-SM-P-065 | |
GV120 Change Felt Head-Plate Filter | S-SM-P-066 | |
Check TC Vacuum Pump Exhaust Filters | S-SM-P-181 | |
CTI On-Board 400 Cryopump Adsorber Change | S-SM-P-068 | |
Target Chamber RGA Scan | S-SM-P-378 | |
OMEGA Target Chamber Entry Procedure | S-SM-P-395 | |
Spatial Filter Vacuum Subsystem Procedures | EH500/EH4200 Blower Oil Level | S-SM-P-089 |
EH4200 Blower Inspect Pump | S-SM-P-090 | |
GV600 Blower Oil Level | S-SM-P-091 | |
GV600 Blower Gas Ballast, Pipes & Connections | S-SM-P-092 | |
EH500 Blower Lubrication | S-SM-P-093 | |
EH500/EH4200 Blower Oil Change | S-SM-P-094 | |
GV600 Blower 18-Month Maintenance | S-SM-P-095 | |
GV600 Blower Oil Change and Vent Filters | S-SM-P-096 | |
GV600 Blower Overhaul | S-SM-P-097 | |
GV600 Blower Replace Pump Motor | S-SM-P-098 | |
Check/Tighten Spider Manifold Fasteners | S-SM-P-099 | |
Replace Branch Isolation Valve Seals | S-SM-P-100 | |
Target Viewing System Procedures | TVS-II Illumination Calibration | S-SM-P-370 |
TVS-II Calibration Data Collection | S-SM-P-373 | |
TVS-II Changing TVS Calibration | S-SM-P-390 | |
TVS-II Shutter Timing Procedure | S-SM-P-381 | |
TVS-II Imperx Camera Replacement | S-SM-P-371 | |
TVS Related Software & Equipment Recovery Procedure | S-SM-P-428 | |
Target Positioner Procedures | Shuttle Rotation | S-SM-P-075 |
Re-Qualify Back-Up Shuttle | S-SM-P-076 | |
Stalk Alignment Test | S-SM-P-079 | |
Replace TPS2 Gate Valve | S-SM-P-080 | |
Ten Inch Manipulator Procedures | Preconditions and Precautions – Install/Remove Break-Out Box | S-SM-P-122 |
Check/Tighten External Fasteners | S-SM-P-123 | |
Check/Tighten Electrical Connections | S-SM-P-124 | |
Check/Replace Drive Coupler | S-SM-P-125 | |
Check/Repair Pneumatic Subsystem | S-SM-P-126 | |
Check/Adjust Door Motions | S-SM-P-127 | |
Check/Repair Door Seal | S-SM-P-128 | |
Check/Tighten Internal Fasteners | S-SM-P-129 | |
Check Valve Seal | w/o TC Entry | |
Replace Valve Seal | w/ TC Entry | |
Check/Repair Side Rollers | S-SM-P-132 | |
Repeatability Test | S-SM-P-133 | |
Leak and Rate of Rise Test | S-SM-P-134 | |
TIM Monitor Cable Calibration | S-SM-P-145 | |
TIM Monthly Maintenance | S-SM-P-297 | |
TIM 6 LOS Mid-Beam Collimator Alignment | S-SM-P-414 | |
Full TIM Maintenance Checklist | S-SM-P-392 | |
Upper Pylon Procedures | Check and Correct UP Alignment | S-SM-P-153 |
Inspect Safety Rack & Engagement Cog | S-SM-P-154 | |
Linear Motor – Inspect Servo Amplifier Contactors | S-SM-P-155 | |
Check Vacuum Seal | S-SM-P-156 | |
Check/Replace Pull Tube Bearings | S-SM-P-157 | |
Replace Vacuum Seal | S-SM-P-158 | |
Gripper Inspection | S-SM-P-159 | |
Gripper Replacement Procedure | S-SM-P-376 | |
MCTC Shroud Recovery Procedure | S-SM-P-396 | |
Target Diagnostic Procedures | Diagnostic CCD Water Change | S-SM-P-135 |
Check Pointing of Neutron Temporal Diagnostic | S-SM-P-136 | |
CPS Preconditions & Precautions | S-SM-P-137 | |
CPS Clean and Lube Lead Screw | S-SM-P-138 | |
CPS Check/Tighten Motor Coupler Screws | S-SM-P-139 | |
CPS Clean Suie Rails and Bearing Surfaces | S-SM-P-140 | |
CPS Check/Repair IP O-Ring | S-SM-P-141 | |
CPS Clean & Wipe Down Interior Surfaces | S-SM-P-142 | |
Replace IR Fiducial Diode Bias Battery | S-SM-P-143 | |
Timing Diagnostic Oscilloscope Calibration | S-SM-P-144 | |
Inspect/Repair XRFC Film Backs | S-SM-P-147 | |
Inspect/Repair XRFC Nosecones | S-SM-P-148 | |
XRFC Timing Calibration | S-SM-P-149 | |
ASBO DI Water Filter Change | S-SM-P-150 | |
ASBO DI Water Anti-Bacterial Treatment | S-SM-P-151 | |
ASBO Flashlamp Replacement | S-SM-P-152 | |
ASBO-SOP T-Zero Timing Procedure | S-SM-P-425 | |
JOBO Vendor Maintenance | S-SM-P-160 | |
DANTE Back Flange Maintenance | S-SM-P-365 | |
DANTE Filter Inspection and Servicing | S-SM-P-366 | |
DANTE Venting and Pumping | S-SM-P-367 | |
SCCAL Vacuum Maintenance and Pumpdown | S-SM-P-369 | |
NDI – MRS Alignment | S-SM-P-377 | |
Crane Procedures | Inspect and Grease Gantry Crane | S-SM-P-101 |
Gantry Crane Contract Service | S-SM-P-102 | |
Inspect and Grease Hydraulic Floor Crane | S-SM-P-103 | |
Inspect and Grease Mechanical Floor Crane | S-SM-P-104 |