OMEGA Beamlines
System Description
Comments
Address document comments, questions and corrections to the OMEGA Associate Laser Facility Manager.
OMEGA System Description | System Overview |
---|---|
Optomechanical System Description |
Shot Procedures
Comments
Address document comments, questions and corrections to the OMEGA Associate Laser Facility Manager.
Document Name | Procedure ID |
---|---|
Beamlines Shot Operation Procedure Index | S-OM-M-014 |
Beamlines Pre-Operation Procedure | S-OM-P-130 |
Beamlines Shot Procedures | |
Beamlines Operator Type 2 Non-Propagating Shot Procedure | S-OM-P-131 |
Beamlines Operator Type 3 A-Split Shot Procedure | S-OM-P-132 |
Beamlines Operator Type 4-7 Propagating Shot Procedure | S-OM-P-133 |
IR ALT Type 2, 4-7 Propagating Shot Procedure | S-OM-P-134 |
UV ALT Type 5-7 Propagating Shot Procedure | S-OM-P-135 |
Beamlines Operator Small Signal Gain Procedure | S-OM-P-136 |
Beamlines Operator C-Nearfield Shot Procedure | S-OM-P-137 |
Beamlines Securing Procedure | S-OM-P-138 |
Laser Amplifiers Startup Procedure | S-OM-P-139 |
Beamlines Daily Maintenance Procedure | S-OM-P-140 |
Startup
Comments
Address document comments, questions and corrections to the OMEGA Associate Laser Facility Manager.
Section | Document Name | Procedure ID |
---|---|---|
Startup | S-OM-P-021 |
Support
Comments
Address document comments, questions and corrections to the OMEGA Associate Laser Facility Manager.
Section | Document Name | Procedure ID |
---|---|---|
Maintenance
Comments
Address document comments, questions, and corrections to the OMEGA Associate Laser Facility Manager.
Section | Document Name | Procedure ID |
---|---|---|
Maintenance Index & Schedules | S-OM-P-030 | |
SUBSYSTEM ACTIONS REQUIRING SHOTS | HED Calibration Check | S-SM-P-242 |
HED Calibration | S-SM-P-243 | |
FCC Tuning Scan | S-SM-P-244 | |
FCC Tuning Check | S-SM-P-245 | |
HED Burn | S-SM-P-246 | |
D Burn | S-SM-P-247 | |
UV Focus Scan | S-SM-P-248 | |
Reference Best Focus | S-SM-P-249 | |
SUBSYSTEM ACTIONS WITHOUT SHOTS | Beam Timing Run | S-SM-P-250 |
OMEGA Transport Instrumentation System (OTIS) | S-SM-P-251 | |
Blast Window Assembly (BWA) UV Transport | S-SM-P-252 | |
Primary Pick-Off (PPO) / DPR Transmission | S-SM-P-253 | |
Measure SG4 DPP Transmission | S-SM-P-254 | |
Full System Auto Balance | S-SM-P-255 | |
Set Splits with Roving Diagnostic | S-SM-P-256 | |
Calibrate Calorimeters – Check | S-SM-P-257 | |
Calibrate Calorimeters – Calibration Series | S-SM-P-258 | |
Two State Control Module | S-SM-P-333 | |
IR ALIGNMENT PROCEDURES
Check Mirror Wavefront Quality |
S-SM-P-259 |
|
Leg Collimation Check | S-SM-P-260 | |
Re-Align A-Rods (S-SM-P-261 | S-SM-P-261 | |
System Crosshair to A-Out Crosshair | S-SM-P-262 | |
A-Out Crosshair to B-In Crosshair | S-SM-P-263 | |
Check/Adjust Alignment: B-Split | S-SM-P-264 | |
Check Alignment at D-Split Input Fiducials | S-SM-P-265 | |
Update F-ASP Coarse Pointing References | S-SM-P-266 | |
Check/Correct Alignment of the Stage F Prisms | S-SM-P-267 | |
Check SSA Alignment, Level | S-SM-P-268 | |
Check Alignment of Spatial Filters | S-SM-P-269 | |
Check Level of FCC Rails | S-SM-P-270 | |
Spatial Filters – Check Leakage Rate | S-SM-P-271 | |
Spatial Filters – Mechanical Checks | S-SM-P-272 | |
Check Spatial Filter PHM Electrical Connections | S-SM-P-273 | |
Beamline Collimation Check | S-SM-P-274 | |
Replace Retro Burn Paper | S-SM-P-275 | |
Check Fixed Optic Lockdowns on IRAT | S-SM-P-276 | |
Check Fixed Optic Lockdowns on A-Split | S-SM-P-277 | |
Check Fixed Optic Lockdowns on B-Split | S-SM-P-278 | |
Check Fixed Optic Lockdowns on C-Splits | S-SM-P-279 | |
Check Fixed Optic Lockdowns on D-Splits | S-SM-P-280 | |
Manual Knife-Edge Pinholes | S-SM-P-281 | |
Remote Knife-Edge D, E, F Pinhole Evaluation | S-SM-P-282 | |
Check Knife-Edge Diagnostic Calibration | S-SM-P-283 | |
LPI Alignment Check | S-SM-P-284 | |
Check D-Shutter Limit Switches | S-SM-P-285 | |
Reference Crystals using Second Tripler Alignment Diagnostic (STAD) | S-SM-P-286 | |
UV ALIGNMENT PROCEDURES | Check/Align HED Spatial Filters | S-SM-P-287 |
Check/Adjust UV Centering DPR In / DPR Out | S-SM-P-288 | |
FLAS Retro Check | S-SM-P-289 | |
UVAT Alignment Check | S-SM-P-290 | |
UVAT Full Alignment | S-SM-P-291 | |
Clean and Inspect UVAT Optics | S-SM-P-292 | |
Pump Diode Replacement for UVAT I & UVAT II | S-SM-P-293 | |
UVAT Collimation Check | S-SM-P-294 | |
Clean UVAT I Particulate Filter | S-SM-P-295 | |
Check / Adjust UVDT Alignment | S-SM-P-296 | |
Operate & Check Out UVAT I & UVAT II | S-SM-P-297 | |
Calorimeter Seal Check | S-SM-P-298 | |
Check HED Coolant Level | S-SM-P-299 | |
Check Burn Paper on Back of F-Cals | S-SM-P-300 | |
Verify Alignment of FLAS Retro Fixture | S-SM-P-301 | |
Check UVAT II Water Level | S-SM-P-302 | |
IRAT PROCEDURES | IRAT Alignment Check | S-SM-P-303 |
IRAT Full Alignment | S-SM-P-304 | |
Clean and Inspect Optics | S-SM-P-305 | |
LONG PATH LENGTH ADJUSTER PROCEDURES | Inspect PLAS | S-SM-P-306 |
Check Mounting Pad Lock-Downs | S-SM-P-307 | |
PLAS Mirror Alignment Checks | S-SM-P-308 | |
D-Split Mirrors – Coordinate Verification | S-SM-P-309 | |
FOCUS LENS PROCEDURES | FLAS Encoder Mechanical Check | S-SM-P-310 |
Replace Compensation Springs | S-SM-P-311 | |
Exercise FLAS Springs | S-SM-P-312 | |
Support BWA Change | S-SM-P-313 | |
Support Focus Lens Change | S-SM-P-314 | |
Support DPP Change | S-SM-P-315 | |
PERISCOPE MIRROR ASSEMBLY PROCEDURES | Inspect/Lubricate RAPIDTRAK Ball Screw | S-SM-P-316 |
Check/Replenish Gearbox Oil | S-SM-P-317 | |
Inspect & Lubricate Kinematic Mount Surfaces | S-SM-P-318 | |
Lubricate Air Cylinder Clevis Pins | S-SM-P-319 | |
Check Pneumatic Filters | S-SM-P-320 | |
Inspect Rails | S-SM-P-321 | |
Check Fasteners | S-SM-P-322 | |
Change Gearbox Oil | S-SM-P-323 | |
Change DeMag Trolley Gearbox Oil | S-SM-P-324 | |
Verify Function of Safety Features | S-SM-P-325 | |
X Travel Calibration | S-SM-P-326 | |
SP PROCEDURES | Inspect and Verify ASP Functionality in the A and C Stages | S-SM-P-327 |
Verify Function and Imaging | S-SM-P-328 | |
Inspect Crosshair Stops | S-SM-P-329 | |
P510 PROCEDURES | Clean P510 Streak Camera Optics | S-SM-P-315 |
P510 Water Chiller Level | S-SM-P-330 | |
HEDVAC PROCEDURES | HEDVAC System Maintenance | S-SM-P-331 |
HEDVAC Pump Maintenance | S-SM-P-332 |