OMEGA EP Experimental Operations
System Description
OMEGA EP System Description | System Overview |
---|---|
Experimental System |
Shot Procedures
Section | Document Name | Procedure ID |
---|---|---|
CHECKLISTS | ESO Pre-Operations Checklist | S-AB-P-172 |
Shot Type 6-7 ESO Checklist | S-AB-P-173 | |
ESO Securing Checklist | S-AB-P-175 | |
SHOT PROCEDURES | Lithium Deuteride Targets Handling Procedure | Q-FA-P-121 |
OMEGA EP Schlieren Calibration Lens Assembly Deployment Procedure | D-EP-P-825 | |
High-Explosive Material Handling Protocol | S-SA-M-080 | |
EQUIPMENT | Target Chamber Pump-down | S-AB-P-202 |
Target Chamber Venting | S-AB-P-203 | |
GCC Pump-down | S-AB-P-204 | |
Grating Compressor Chamber Venting Procedure | S-AB-P-205 | |
OMEGA EP Off-Axis Parabola Inserter and Manipulator | S- AB-P-414 |
Maintenance
Section | Document Name | Procedure ID |
---|---|---|
INDEX AND CYCLE SCHEDULE | S-AB-P-022 | |
BEAMLINE | Cryogenic Pump Regeneration Procedure | S-AB-P-399 |
FACILITY | OMEGA EP Bay Exterior Roll-up Door Operation | S-AB-P-687 |
Planned Power Outage Securing Checklist | S-AB-P-689 | |
Planned Power Outage Recovery Checklist | S-AB-P-690 | |
TAS AND GCC | TAS and GCC Platform Tightening | S-AB-P-182 |
GCC Cryogenic Pump Regeneration Process | S-AB-P-447 | |
GCC Hoist Installation and Removal Procedure | S-AB-P-487 | |
GCC Venting Procedure | S-AB-P-205 | |
Securing Checklist for GCC Pumpdown | S-AB-P-201 | |
GCC Pumpdown Procedure | S-AB-P-204 | |
Preparation for Personnel Entry of GCC | S-AB-P-401 | |
GCC Equipment Door Operation | M-BB-M-001 | |
TARGET CHAMBER | ESO Checklist for EP Target Chamber Entry | S-AB-P-192 |
CTI Cryogenic Pump Regeneration Process | S-AB-P-399 | |
Target Chamber Venting | S-AB-P-203 | |
Targer Chamber Pumpdown Procedure | S-AB-P-202 | |
TVS | TVS Maintenance – Vacuum TCC Calibration | S-AB-P-277 |
Target Viewing System Maintenance Distortion Calibration | S-AB-P-458 | |
Target Viewing system Maintenance TVS Shutter Assembly Replacement | S-AB-P-459 | |
EP Target Viewing System Maintenance Focus Stage Calibration | S-AB-P-480 | |
TPS | Target Positioning System Maintenance Target Positioning Shuttle (TPS) PM | S-AB-P-485 |
TIM | TIM Monitor Cable Calibration | S-AB-P-439 |
Oscilloscope Calibration | S-SM-P-134 | |
TIM Repeatability Characterization | S-AB-P-633 | |
RADIATION | Ludlum Model 9 Inspect/Replace Desiccant packages | S-AB-P-662 |
Target Chamber/TAS and Laser Bay General Survey | S-AB-P-696 | |
Target Chamber Internal Surface Contamination Survey and Alpha Swipe | S-AB-P-697 | |
GCC Internal Surface Contamination Survey | LLEINST 6610-3004 |