OMEGA EP Experimental Operations
System Description
OMEGA EP System Description | |
System Overview | |
Experimental System |
Shot Procedures
Section | Document Name | Procedure ID |
Shot Checklists | ||
Shot Type 6-7 ESO Checklist | S-AB-P-173 | |
Lithium Deuteride Targets Handling Procedure | Q-FA-P-121 | |
OMEGA EP Schlieren Calibration Lens Assembly Deployment Procedure | D-EP-P-825 | |
Equipment | ||
Target Chamber Pump-down | S-AB-P-202 | |
Target Chamber Venting | S-AB-P-203 | |
GCC Pump-down | S-AB-P-204 | |
Grating Compressor Chamber Venting Procedure | S-AB-P-205 | |
OMEGA EP Off-Axis Parabola Inserter and Manipulator | S- AB-P-414 | |
Checklists | ||
ESO Pre-Operations Checklist | S-AB-P-172 | |
ESO Securing Checklist | S-AB-P-175 |
Maintenance
Section | Document Name | Procedure ID |
Index and Cycle Schedule | S-AB-P-022 | |
Beamline Nitrogen Supply | ||
Beamline Enclosure Nitrogen ‘Low-flow’ Rate Adjustment | S-AB-P-167 | |
TAS and GCC | ||
TAS and GCC Platform Tightening | S-AB-P-182 | |
GCC Cryogenic Pump Regeneration Process | S-AB-P-447 | |
GCC Hoist Installation and Removal Procedure | S-AB-P-487 | |
GCC Venting Procedure | S-AB-P-205 | |
Securing Checklist for GCC Pumpdown | S-AB-P-201 | |
GCC Pumpdown Procedure | S-AB-P-204 | |
Target Chamber | ||
ESO Checklist for EP Target Chamber Entry | S-AB-P-192 | |
CTI Cryogenic Pump Regeneration Process | S-AB-P-399 | |
Target Chamber Venting | S-AB-P-203 | |
Targer Chamber Pumpdown Procedure | S-AB-P-202 | |
TVS | ||
TVS Maintenance – Vacuum TCC Calibration | S-AB-P-277 | |
Target Viewing System Maintenance Distortion Calibration | S-AB-P-458 | |
Target Viewing system Maintenance TVS Shutter Assembly Replacement | S-AB-P-459 | |
EP Target Viewing System Maintenance Focus Stage Calibration | S-AB-P-480 | |
TPS | ||
Target Positioning System Maintenance Target Positioning Shuttle (TPS) PM | S-AB-P-485 | |
TIM | ||
TIM Monitor Cable Calibration | S-AB-P-439 |