OMEGA EP Beamlines
System Description
OMEGA EP SYSTEM DESCRIPTION | System Overview |
Optomechanical System | |
LASER BAY INFORMATION | M-CC-P-004 OMEGA EP Cleanroom Gowning/Degowning Procedure |
LLE Radiological Controls Manual (LLE Instruction 6610) |
Shot Procedures
Section | Document Name | Procedure ID |
---|---|---|
PRE-OPS, WATCH RELIEF, SECURING | Beamlines Operator Pre-Operations Checklist | S-AB-P-156 |
Alignment Technician Pre-Operations Checklist | S-AB-P-155 | |
Beamlines Watch Relief Checklist | S-AB-P-523 | |
Beamlines Daily Securing Checklist | S-AB-P-482 | |
SHOT CHECKLISTS | Shot Type 2: BLO Non-Propagating Checklist | S-AB-P-125 |
Shot Type 2: ALT Non-Propagating Checklist | S-AB-P-145 | |
Shot Type 3: BLO Procedure | S-AB-P-124 | |
Shot Type 4A/5A: BLO Checklist for Long-Pulse Operation to The Switchyard CAL | S-AB-P-126 | |
Shot Type 4B/5B: BLO Checklist for Short-Pulse Operation to The Switchyard CAL | S-AB-P-148 | |
Shot Type 4C/5C: BLO Checklist for Long-Pulse Operation to the UV-DBS Beam Dump | S-AB-P-241 | |
Shot Type 4D/5D: BLO Checklist for Short-Pulse Operation to The GCC CAL | S-AB-P-230 | |
Shot Type 4D/5D: BLO SP Operation to the GCC Cal with f/20 or Greater Apodizer | S-AB-P-727 | |
Shot Type 4E: BLO Checklist for Short Pulse Operation to TC (FSM) | S-AB-P-590 | |
Shot Type 4F/5F: BLO Checklist for Long-Pulse to TOP9 Calorimeter | S-AB-P-672 | |
Shot Type 4T: BLO Checklist for SP Timing Shots to the TC | S-AB-P-611 | |
Shot Type 6: BLO Checklist for Long Pulse Operation To TC | S-AB-P-214 | |
Shot Type 6: BLO Checklist for Long Pulse Target Shot to OMEGA TC | S-AB-P-673 | |
Shot Type 7: BLO Checklist for Short Pulse Operation To TC | S-AB-P-212 | |
Shot Type 7: BLO Checklist for SP Operation to TC with f/20 or Greater Apodizer | S-AB-P-726 | |
Beamlines Abort and Postshot Checklists | S-AB-P-129 | |
Beamlines Post-Shot High Voltage Shutdown Recovery | S-AB-P-344 | |
ALT Propagating Shot Checklist | S-AB-P-418 | |
SWEEP CHECKLISTS | EP Closed Access Sweep Checklist | S-AB-P-199 |
EP Closed Access Sweep for OMEGA Type 7B Shot | S-AB-P-200 | |
EP Bay 4Wprobe Laser Sweep Procedure | S-AB-P-465 | |
Diagnostic Bay Closed Access Checklist | S-AB-P-655 | |
Capacitor Bay Sweep Checklist | S-AB-P-538 | |
EP Bay and OAA Securing Walkthrough | S-AB-P-582 | |
GCC Sweep Procedure | S-AB-P-515 |
Startup
Section | Document Name | Procedure ID |
---|---|---|
IRAT IPG Laser Startup and Shutdown Procedure | S-AB-P-638 | |
SPDP Laser Startup Procedure | S-AB-P-042 | |
SPDP Laser Shutdown Procedure | S-AB-P-043 | |
PAD Laser Startup and Shutdown Procedure | S-AB-P-109 | |
UVAT Laser Startup and Shutdown Procedure | S-AB-P-151 | |
IRAT Laser Startup Procedure | S-AB-P-040 | |
IRAT Laser Shutdown Procedure | S-AB-P-041 | |
PAD Table Laser Startup/Shutdown Procedure | S-AB-P-460 | |
PEPC Test Stand Laser Startup and Shutdown Procedure | S-AB-P-044 | |
PEPC | PEPC Software Startup and Shutdown | S-AB-P-136 |
PEPC Hardware Startup and Shutdown | S-AB-P-333 | |
Startup of The PEPC High Voltage System | S-AB-P-135 | |
WCS | WCS Software Startup & Shutdown | S-AB-P-127 |
Deformable Mirror Hardware Startup and Shutdown Procedures | S-AB-P-134 | |
DIAGNOSTICS | TSF OTDR Scope Startup and Shutdown Procedure | S-AB-P-246 |
Beamlines Scientific Camera Startup and Shutdown | S-AB-P-113 | |
HED Hardware Startup and Shutdown | S-AB-P-456 |
Support
Section | Document Name | Procedure ID |
---|---|---|
LP ALIGNMENT PROCEDURES | IRAT and Sources Injection Alignment Procedure | S-AB-P-111 |
Main Beamline 4-Pass Mode Alignment Procedure | S-AB-P-209 | |
Main Beamline 2-Pass Mode Alignment | S-AB-P-273 | |
IRAT to UVDP Alignment | S-AB-P-223 | |
UV Targeting Procedure | S-AB-P-211 | |
UV Daily Startup Alignment Check | S-AB-P-483 | |
SP ALIGNMENT PROCEDURES | IRAT and Sources Injection Alignment Procedure | S-AB-P-111 |
Main Beamline 4-Pass Mode Alignment Procedure | S-AB-P-209 | |
Main Beamline 2-pass mode alignment | S-AB-P-273 | |
SPDP Startup Alignment Check | S-AB-P-184 | |
Compressor Daily Pointing Check | S-AB-P-196 | |
IRAT/OPCPA To SPDP Alignment Check | S-AB-P-197 | |
SPDP ASP Centering Image Using the TSF Pass-4 Fiber | S-AB-P-412 | |
SPDP WCS Wavefront Correction with Pass-4 Fiber Procedure | S-AB-P-639 | |
Short Pulse Retro Targeting Procedure | S-AB-P-542 | |
Short Pulse Transport and Focusing Procedure | S-AB-P-541 | |
Short-Pulse Co-Prop Targeting | S-AB-P-626 | |
Sub-Aperture Apodizer Installation & Removal | S-AB-P-688 | |
SPDP ASP Centering Image Using SPDP Laser off CAM3 | S-AB-P-719 | |
ALIGNMENT SUPPORT PROCEDURES | WCS Wavefront Correction Procedure | S-AB-P-138 |
RATIOMETER PROCEDURES | UV Ratiometer Measurement | S-AB-P-094 |
IR Ratiometer Measurement | S-AB-P-631 | |
BEAMLINE ENVIRONMENT PROCEDURES | Main Beamline Spatial Filter Vent & Pump Procedure | S-AB-P-245 |
Beamline Enclosure Access Procedures | S-AB-P-152 | |
POWER OUTAGE CHECKLISTS | Beamlines Planned Power Outage Recovery | S-AB-P-608 |
Beamlines Pre-Electrical Shutdown Checklist | S-AB-P-609 | |
Beamlines Unplanned Power Outage Recovery | S-AB-P-610 | |
OTHER | GCC Access | S-AB-P-516 |
Beamlines ETP Setup and Recovery | S-AB-P-647 | |
TOP9 Configuration Checklist | S-AB-P-693 |
Maintenance
Section | Document Name | Procedure ID |
---|---|---|
MAIN BEAMLINES MAINTENANCE | ||
IRAT | IRAT Power Output Check | S-AB-P-255 |
IRAT Table Fine Alignment Maintenance | S-AB-P-256 | |
Injection Throttle Calibration | S-AB-P-640 | |
Centering IRAT Energy on Apodizer Procedure | S-AB-P-354 | |
IRAT Collimation Check | S-AB-P-724 | |
IRAT Replacement Procedure | S-AB-P-331 | |
Small Optics Inspections on Diagnostic Tables | S-AB-P-112 | |
TSF AND CSF VESSEL | Beamline Alignment Pinhole Tracking Maintenance | S-AB-P-250 |
Beamline Alignment Pinhole Replacement | S-AB-P-249 | |
Beamline Shot Pinhole Centering Maintenance | S-AB-P-327 | |
TSF and CSF Pinhole Slide Maintenance | S-AB-P-723 | |
TSF and CSF SHOT Pinhole Replacement Procedure | S-AB-P-641 | |
TSF & CSF Conical Pinhole Inspection and Alignment Procedure | S-AB-P-251 | |
Beamline TSF & CSF Illuminator Intensity Balance | S-AB-P-352 | |
TSF & CSF PVS Illuminator Bulb Replacement Procedure | S-AB-P-229 | |
TSF & CSF PVS Imaging Adjustment Procedure | S-AB-P-326 | |
Beamline TSF Injection Vacuum Window Replacement Procedure | S-AB-P-356 | |
Injection Mirror Replacement Procedure | S-AB-P-330 | |
Beamline FM1 Optic Replacement Procedure | S-AB-P-347 | |
MAIN BEAMLINE | Beamline Centering Check and Correction | S-AB-P-253 |
Beamline Enclosure Nitrogen ‘Low-Flow’ Rate Adjustment | S-AB-P-167 | |
Nitrogen Filter Cartridge Inspection and Replacement | S-AB-P-165 | |
Beamline Humidity Sensor Replacement | S-AB-P-164 | |
Gapodizer Centering Check | S-AB-P-630 | |
Gapodizer Blade Replacement | S-AB-P-643 | |
Adjusting the Coarse Actuators on the Large Optic Mounts | S-AB-P-426 | |
IR-DBS Removal & Installation | S-AB-P-260 | |
Cleaning and Greasing the SY Cal Rails | S-AB-P-731 | |
PEPC | PEPC Empty Gas Tank Check | S-AB-P-247 |
PEPC Gas Supply Cylinder Replacement Maintenance Procedure | S-AB-P-221 | |
PEPC Solid State Switch Pulse Generator Led Monitoring PM Procedure | S-AB-P-244 | |
PEPC Timing Maintenance Procedure | S-AB-P-220 | |
PEPC Process Gas Filter Replacement | S-AB-P-248 | |
PEPC Nitrogen Purge and Vacuum Prep Procedure | S-AB-P-325 | |
PEPC Vacuum Isolation and Pumping Procedure | S-AB-P-334 | |
PEPC Chiller Flush Maintenance | S-AB-P-258 | |
CCD & PEPC Chiller Coolant Filling Maintenance Procedure | S-AB-P-259 | |
PEPC PPG Relay Inspection and Replacement | S-AB-P-694 | |
PEPC Enclosure and Cell Inspection | S-AB-P-695 | |
PEPC Contrast Shot Campaign | S-AB-P-715 | |
WCS | Beamline Wavefront Control System Calibration Procedure | S-AB-P-130 |
WCS Reference Wavefront Acquisition Procedure | S-AB-P-139 | |
SPDP Wavefront Control System Calibration | S-AB-P-290 | |
SPDP WCS Reference Wavefront Acquisition Procedure | S-AB-P-464 | |
Beamline DM TILT Removal Maintenance Procedure | S-AB-P-328 | |
WCS PID File Creation | S-AB-P-476 | |
Deformable Mirror Hardware Voltage Calibration | S-AB-P-261 | |
WCS Lenslet Registration | S-AB-P-625 | |
IRDP | IRDP Output Path Alignment Maintenance | S-AB-P-254 |
Small Optics Inspections on Diagnostic Tables | S-AB-P-112 | |
UV Maintenance | ||
UVAT | UV Daily Startup Alignment Check | S-AB-P-483 |
UVAT Laser Output Check | S-AB-P-262 | |
UVAT Laser Output Window Replacement/Cleaning | S-AB-P-227 | |
UVAT Laser Diode Power Output Check | S-AB-P-228 | |
UVAT Large and Small Beam Co-Alignment | S-AB-P-252 | |
UVAT Maintenance Alignment Check | S-AB-P-193 | |
UVAT Collimation Check | S-AB-P-263 | |
Small Optics Inspections on Diagnostic Tables | S-AB-P-112 | |
LP SWITCHYARD | LP SY mirror centering check | S-AB-P-271 |
PMAs | Actuate the PMA3 Lift/Slide | S-AB-P-272 |
PMA Maintenance Alignment Check | S-AB-P-171 | |
FCCs | FCC Enclosure Cleaning Procedure | S-AB-P-395 |
FCC IR and UV Alignment Check | S-AB-P-612 | |
FCC Retro-Alignment Maintenance Procedure | S-AB-P-351 | |
UVDP | UVAT to UVDP ASPS Centering Check | S-AB-P-264 |
UVDP On-Shot Diagnostics Alignment Check | S-AB-P-266 | |
UVDP Crosshair to Crosshair Alignment Check | S-AB-P-265 | |
HED Alignment Check | S-AB-P-224 | |
HED Cabinet Filter Check and Replacement | S-AB-P-457 | |
UVDP Calorimeter Clip Check Procedure | S-AB-P-396 | |
UV Calorimeter Mirrors, HED Mirror, and ASP Mirror Reflectance Test | S-AB-P-336 | |
UVDP NF IRIS Check Procedure | S-AB-P-270 | |
UVDP NF Calibration Image Procedure | S-AB-P-267 | |
UVDP NF Lens Re-Focusing | S-AB-P-279 | |
UVDP FF Calibration Image Procedure | S-AB-P-268 | |
UVDP FF Lens Re-Focusing | S-AB-P-278 | |
Small Optics Inspections on Diagnostic Tables | S-AB-P-112 | |
HED Burn Paper Installation and Removal | S-AB-P-732 | |
UV TRANSPORT MIRRORS AND FOCUSING OPTICS | CW Best Focus | S-AB-P-645 |
UV Final Optic Reflectivity Measurement | S-AB-P-646 | |
Adjusting the Coarse Actuators on the Large Optic Mounts | S-AB-P-426 | |
UV Centering Check to the Focus Lens | S-AB-P-717 | |
UVHR1 and UVHR2 Mirror Limits Check | S-AB-P-718 | |
SP MAINTENANCE | ||
GCC | TGA Monitoring Check | S-AB-P-281 |
TGA High Potential Check | S-AB-P-280 | |
Compressor Weekly Alignment Check | S-AB-P-552 | |
GCC Venting Procedure | S-AB-P-205 | |
Preparation for Manned Entry of the GCC | S-AB-P-401 | |
Installing the Beam Combiner Reference | S-AB-P-702 | |
GCC Device Current Measurements | S-AB-P-686 | |
GCC Slides Cleaning and Inspection | S-AB-P-648 | |
Getter and Grating Witness Placement in the GCC | S-AB-P-652 | |
GCC Getter Tray Maintenance | S-AB-P-685 | |
SECURING the GCC for Pump-Down | S-AB-P-201 | |
Post GCC Pump Down Recovery Procedure | S-AB-P-337 | |
Grating Tiling in GCC | S-AB-P-284 | |
Far-Field Tiling in GCC | S-AB-P-285 | |
Full Compressor Alignment | S-AB-P-286 | |
SPDP Waxer Wedge Beam Dump Alignment Procedure | S-AB-P-657 | |
Best Compression Search | S-AB-P-474 | |
SPDP | IRAT Laser Fine Alignment to the SPDP ASPS | S-AB-P-513 |
SPDP Table Alignment Procedure | S-AB-P-186 | |
SPDP Laser Power Output Power Check | S-AB-P-291 | |
SPDP Diagnostic Alignment Check | S-AB-P-289 | |
SPDP WCS Reference Wavefront Acquisition Procedure | S-AB-P-464 | |
SPDP Wavefront Control System Calibration | S-AB-P-290 | |
SPDP Spatial Filter Pumpdown | S-AB-P-628 | |
HCD Table Alignment Check | S-AB-P-443 | |
HCD Diode Calibration | S-AB-P-442 | |
Small Optics Inspections on Diagnostic Tables | S-AB-P-112 | |
PAD | PAD Configuration Procedure | S-AB-P-597 |
FSM | FSM Shot Alignment Procedure | S-AB-P-653 |
FSM Configuration Procedure | S-AB-P-613 | |
SP TARGETING | Short Pulse Transport and Focusing Procedure | S-AB-P-541 |
Ratiometer Ball Cleaning & Inspection | S-AB-P-678 | |
DIAGNOSTICS | ||
GENERAL DIAGNOSTICS | Beamlines ND Filter Check and Cleaning | S-AB-P-512 |
SCIENTIFIC CAMERAS | CCD Camera Vacuum Pressure Check | S-AB-P-242 |
CCD Camera Pumpdown | S-AB-P-243 | |
CCD & PEPC Chiller Coolant Filling Maintenance Procedure | S-AB-P-259 | |
Scientific Camera Chiller Flush Maintenance | S-AB-P-257 | |
SI-800 Snout Assembly Procedure | S-AB-P-594 | |
Assembly of LLE Snout to SI800 Camera | S-AB-P-398 | |
Procedure to Hard-Time a SI-800 CCD Camera in OMEGA EP | S-AB-P-140 | |
SI-800 FF Installation and Calibration Procedure for the IRDP Table | S-AB-P-721 | |
CALORIMETERS | Calorimeter Calibration Single Point Check | S-AB-P-428 |
Calorimeter Calibration Series Procedure | S-AB-P-429 | |
MAINTENANCE SHOT PROCEDURES | Cavity Hold-Off Test | S-AB-P-054 |
Beamlines NF and ED Calibration Procedure | S-AB-P-486 | |
Injection Throttle Calibration | S-AB-P-640 | |
HED Calibration | S-AB-P-632 | |
PEPC Contrast Shot Campaign | S-AB-P-715 | |
Omega EP Frequency Conversion Crystal (FCC) Tuning Procedure | S-AB-P-635 |