OMEGA EP Beamlines
System Description
OMEGA EP System Description | |
System Overview | |
Optomechanical System | |
Laser Bay Information | |
M-CC-P-004 OMEGA EP Cleanroom Gowning/Degowning Procedure | |
LLE Radiological Controls Manual (LLE Instruction 6610) |
Shot Procedures
Section | Document Name | Procedure ID |
Pre-Ops, Watch Relief, Securing | ||
BEAMLINES OPERATOR PRE-OPERATIONS CHECKLIST | S-AB-P-156 | |
ALIGNMENT TECHNICIAN PRE-OPERATIONS CHECKLIST | S-AB-P-155 | |
BEAMLINES WATCH RELIEF CHECKLIST | S-AB-P-523 | |
BEAMLINES DAILY SECURING CHECKLIST | S-AB-P-482 | |
Shot Checklists | ||
SHOT TYPE 2: BLO NON-PROPAGATING CHECKLIST | S-AB-P-125 | |
SHOT TYPE 2: ALT NON-PROPAGATING CHECKLIST | S-AB-P-145 | |
SHOT TYPE 3: BLO PROCEDURE | S-AB-P-124 | |
SHOT TYPE 4A/5A: BLO CHECKLIST FOR LONG-PULSE OPERATION TO THE SWITCHYARD CAL | S-AB-P-126 | |
SHOT TYPE 4B/5B: BLO CHECKLIST FOR SHORT-PULSE OPERATION TO THE SWITCHYARD CAL | S-AB-P-148 | |
SHOT TYPE 4C/5C: BLO CHECKLIST FOR LONG-PULSE OPERATION TO THE UV-DBS BEAM DUMP | S-AB-P-241 | |
SHOT TYPE 4D/5D: BLO CHECKLIST FOR SHORT-PULSE OPERATION TO THE GCC CAL | S-AB-P-230 | |
SHOT TYPE 4E: BLO CHECKLIST FOR SHORT PULSE OPERATION TO TC (FSM) | S-AB-P-590 | |
SHOT TYPE 4F/5F: BLO CHECKLIST FOR LONG-PULSE TO TOP9 CALORIMETER | S-AB-P-672 | |
SHOT TYPE 4T: BLO CHECKLIST FOR SP TIMING SHOTS TO THE TC | S-AB-P-611 | |
SHOT TYPE 6: BLO CHECKLIST FOR LONG PULSE OPERATION TO TC | S-AB-P-214 | |
SHOT TYPE 6: BLO CHECKLIST FOR LONG PULSE TARGET SHOT TO OMEGA TC | S-AB-P-673 | |
SHOT TYPE 7: BLO CHECKLIST FOR SHORT PULSE OPERATION TO TC | S-AB-P-212 | |
BEAMLINES ABORT AND POSTSHOT CHECKLISTS | S-AB-P-129 | |
BEAMLINES POST-SHOT HIGH VOLTAGE SHUTDOWN RECOVERY | S-AB-P-344 | |
ALT PROPAGATING SHOT CHECKLIST | S-AB-P-418 | |
Sweep Checklists | ||
EP CLOSED ACCESS SWEEP CHECKLIST | S-AB-P-199 | |
EP CLOSED ACCESS SWEEP FOR OMEGA TYPE 7B SHOT | S-AB-P-200 | |
EP BAY 4WPROBE LASER SWEEP PROCEDURE | S-AB-P-465 | |
DIAGNOSTIC BAY CLOSED ACCESS CHECKLIST | S-AB-P-655 | |
CAPACITOR BAY SWEEP CHECKLIST | S-AB-P-538 | |
EP BAY AND OAA SECURING WALKTHROUGH | S-AB-P-582 | |
GCC SWEEP PROCEDURE | S-AB-P-515 |
Startup
Section | Document Name | Procedure ID |
Lasers | ||
IRAT IPG LASER STARTUP AND SHUTDOWN PROCEDURE | S-AB-P-638 | |
SPDP LASER STARTUP PROCEDURE | S-AB-P-042 | |
SPDP LASER SHUTDOWN PROCEDURE | S-AB-P-043 | |
PAD LASER STARTUP AND SHUTDOWN PROCEDURE | S-AB-P-109 | |
UVAT LASER STARTUP AND SHUTDOWN PROCEDURE | S-AB-P-151 | |
IRAT LASER STARTUP PROCEDURE | S-AB-P-040 | |
IRAT LASER SHUTDOWN PROCEDURE | S-AB-P-041 | |
PAD TABLE LASER STARTUP/SHUDOWN PROCEDURE | S-AB-P-460 | |
PEPC TEST STAND LASER STARTUP AND SHUTDOWN PROCEDURE | S-AB-P-044 | |
PEPC | ||
PEPC SOFTWARE STARTUP AND SHUTDOWN | S-AB-P-136 | |
PEPC HARDWARE STARTUP AND SHUTDOWN | S-AB-P-333 | |
STARTUP OF THE PEPC HIGH VOLTAGE SYSTEM | S-AB-P-135 | |
WCS | ||
WCS SOFTWARE STARTUP & SHUTDOWN | S-AB-P-127 | |
DEFORMABLE MIRROR HARDWARE STARTUP AND SHUTDOWN PROCEDURES | S-AB-P-134 | |
DIAGNOSTICS | ||
TSF OTDR SCOPE STARTUP AND SHUTDOWN PROCEDURE | S-AB-P-246 | |
BEAMLINES SCIENTIFIC CAMERA STARTUP AND SHUTDOWN | S-AB-P-113 | |
HED HARDWARE STARTUP AND SHUTDOWN | S-AB-P-456 |
Support
Section | Document Name | Procedure ID |
LP Alignment Procedures | ||
IRAT AND SOURCES INJECTION ALIGNMENT PROCEDURE | S-AB-P-111 | |
MAIN BEAMLINE 4-PASS MODE ALIGNMENT PROCEDURE | S-AB-P-209 | |
MAIN BEAMLINE 2-PASS MODE ALIGNMENT | S-AB-P-273 | |
IRAT TO UVDP ALIGNMENT | S-AB-P-223 | |
UV TARGETING PROCEDURE | S-AB-P-211 | |
UV DAILY STARTUP ALIGNMENT CHECK | S-AB-P-483 | |
SP Alignment Procedures | ||
IRAT AND SOURCES INJECTION ALIGNMENT PROCEDURE | S-AB-P-111 | |
MAIN BEAMLINE 4-PASS MODE ALIGNMENT PROCEDURE | S-AB-P-209 | |
MAIN BEAMLINE 2-PASS MODE ALIGNMENT | S-AB-P-273 | |
SPDP STARTUP ALIGNMENT CHECK | S-AB-P-184 | |
COMPRESSOR DAILY POINTING CHECK | S-AB-P-196 | |
IRAT/OPCPA TO SPDP ALIGNMENT CHECK | S-AB-P-197 | |
SPDP NF CAMERA IMAGE USING THE TSF PASS-4 FIBER | S-AB-P-412 | |
SPDP WCS WAVEFRONT CORRECTION WITH PASS-4 FIBER PROCEDURE | S-AB-P-639 | |
SHORT PULSE RETRO TARGETING PROCEDURE | S-AB-P-542 | |
SHORT PULSE TRANSPORT AND FOCUSING PROCEDURE | S-AB-P-541 | |
SHORT-PULSE CO-PROP TARGETING | S-AB-P-626 | |
SUB-APERTURE APODIZER INSTALLATION & REMOVAL | S-AB-P-688 | |
Alignment Support Procedures | ||
WCS WAVEFRONT CORRECTION PROCEDURE | S-AB-P-138 | |
Ratiometer Procedures | ||
UV RATIOMETER MEASUREMENT | S-AB-P-094 | |
IR RATIOMETER MEASUREMENT | S-AB-P-631 | |
Beamline Environment Procedures | ||
MAIN BEAMLINE SPATIAL FILTER VENT & PUMP PROCEDURE | S-AB-P-245 | |
BEAMLINE ENCLOSURE ACCESS PROCEDURES | S-AB-P-152 | |
Power Outage Checklists | ||
BEAMLINES PLANNED POWER OUTAGE RECOVERY | S-AB-P-608 | |
BEAMLINES PRE-ELECTRICAL SHUTDOWN CHECKLIST | S-AB-P-609 | |
BEAMLINES UNPLANNED POWER OUTAGE RECOVERY | S-AB-P-610 | |
Other | ||
GCC ACCESS | S-AB-P-516 | |
BEAMLINES ETP SETUP AND RECOVERY | S-AB-P-647 | |
TOP9 CONFIGURATION CHECKLIST | S-AB-P-693 |
Maintenance
Section | Document Name | Procedure ID |
Main Beamlines Maintenance | ||
IRAT | ||
IRAT POWER OUTPUT CHECK | S-AB-P-255 | |
IRAT TABLE FINE ALIGNMENT MAINTENANCE | S-AB-P-256 | |
INJECTION THROTTLE CALIBRATION | S-AB-P-640 | |
CENTERING IRAT ENERGY ON APODIZER PROCEDURE | S-AB-P-354 | |
IRAT REPLACEMENT PROCEDURE | S-AB-P-331 | |
SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES | S-AB-P-112 | |
TSF and CSF Vessel | ||
BEAMLINE ALIGNMENT PINHOLE TRACKING MAINTENANCE | S-AB-P-250 | |
BEAMLINE ALIGNMENT PINHOLE REPLACEMENT | S-AB-P-249 | |
BEAMLINE SHOT PINHOLE CENTERING MAINTENANCE | S-AB-P-327 | |
TSF AND CSF SHOT PINHOLE REPLACEMENT PROCEDURE | S-AB-P-641 | |
TSF & CSF CONICAL PINHOLE INSPECTION AND ALIGNMENT PROCEDURE | S-AB-P-251 | |
BEAMLINE TSF & CSF ILLUMINATOR INTENSITY BALANCE | S-AB-P-352 | |
TSF & CSF PVS ILLUMINATOR BULB REPLACEMENT PROCEDURE | S-AB-P-229 | |
TSF & CSF PVS IMAGING ADJUSTMENT PROCEDURE | S-AB-P-326 | |
BEAMLINE TSF INJECTION VACUUM WINDOW REPLACEMENT PROCEDURE | S-AB-P-356 | |
INJECTION MIRROR REPLACEMENT PROCEDURE | S-AB-P-330 | |
BEAMLINE FM1 OPTIC REPLACEMENT PROCEDURE | S-AB-P-347 | |
Main Beamline | ||
BEAMLINE CENTERING CHECK AND CORRECTION | S-AB-P-253 | |
BEAMLINE ENCLOSURE NITROGEN ‘LOW-FLOW’ RATE ADJUSTMENT | S-AB-P-167 | |
NITROGEN FILTER CARTRIDGE INSPECTION AND REPLACEMENT | S-AB-P-165 | |
BEAMLINE HUMIDITY SENSOR REPLACEMENT | S-AB-P-164 | |
GAPODIZER CENTERING CHECK | S-AB-P-630 | |
GAPODIZER BLADE REPLACEMENT | S-AB-P-643 | |
ADJUSTING THE COARSE ACTUATORS ON THE LARGE OPTIC MOUNTS | S-AB-P-426 | |
IR-DBS REMOVAL & INSTALLATION | S-AB-P-260 | |
PEPC | ||
PEPC EMPTY GAS TANK CHECK | S-AB-P-247 | |
PEPC GAS SUPPLY CYLINDER REPLACEMENT MAINTENANCE PROCEDURE | S-AB-P-221 | |
PEPC SOLID STATE SWITCH PULSE GENERATOR LED MONITORING PM PROCEDURE | S-AB-P-244 | |
PEPC TIMING MAINTENANCE PROCEDURE | S-AB-P-220 | |
PEPC PROCESS GAS FILTER REPLACEMENT | S-AB-P-248 | |
PEPC NITROGEN PURGE AND VACUUM PREP PROCEDURE | S-AB-P-325 | |
PEPC VACUUM ISOLATION AND PUMPING PROCEDURE | S-AB-P-334 | |
PEPC CHILLER FLUSH MAINTENANCE | S-AB-P-258 | |
CCD & PEPC CHILLER COOLANT FILLING MAINTENANCE PROCEDURE | S-AB-P-259 | |
PEPC PPG RELAY INSPECTION AND REPLACEMENT | S-AB-P-694 | |
PEPC ENCLOSURE AND CELL INSPECTION | S-AB-P-695 | |
WCS | ||
BEAMLINE WAVEFRONT CONTROL SYSTEM CALIBRATION PROCEDURE | S-AB-P-130 | |
WCS REFERENCE WAVEFRONT ACQUSITION PROCEDURE | S-AB-P-139 | |
SPDP WAVEFRONT CONTROL SYSTEM CALIBRATION | S-AB-P-290 | |
SPDP WCS REFERENCE WAVEFRONT ACQUISITION PROCEDURE | S-AB-P-464 | |
BEAMLINE DM TILT REMOVAL MAINTENANCE PROCEDURE | S-AB-P-328 | |
WCS PID FILE CREATION | S-AB-P-476 | |
DEFORMABLE MIRROR HARDWARE VOLTAGE CALIBRATION | S-AB-P-261 | |
WCS LENSLET REGISTRATION | S-AB-P-625 | |
IRDP | ||
IRDP OUTPUT PATH ALIGNMENT MAINTENANCE | S-AB-P-254 | |
SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES | S-AB-P-112 | |
UV Maintenance | ||
UVAT | ||
UV DAILY STARTUP ALIGNMENT CHECK | S-AB-P-483 | |
UVAT LASER OUTPUT CHECK | S-AB-P-262 | |
UVAT LASER OUTPUT WINDOW REPLACEMENT/CLEANING | S-AB-P-227 | |
UVAT LASER DIODE POWER OUTPUT CHECK | S-AB-P-228 | |
UVAT LARGE AND SMALL BEAM CO-ALIGNMENT | S-AB-P-252 | |
UVAT MAINTENANCE ALIGNMENT CHECK | S-AB-P-193 | |
UVAT COLLIMATION CHECK | S-AB-P-263 | |
SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES | S-AB-P-112 | |
LP Switchyard | ||
LP SY MIRROR CENTERING CHECK | S-AB-P-271 | |
PMAs | ||
ACTUATE THE PMA3 LIFT/SLIDE | S-AB-P-272 | |
PMA MAINTENANCE ALIGNMENT CHECK | S-AB-P-171 | |
FCCs | ||
FCC ENCLOSURE CLEANING PROCEDURE | S-AB-P-395 | |
FCC IR AND UV ALIGNMENT CHECK | S-AB-P-612 | |
FCC RETRO-ALIGNMENT MAINTENANCE PROCEDURE | S-AB-P-351 | |
UVDP | ||
UVAT TO UVDP ASPS CENTERING CHECK | S-AB-P-264 | |
UVDP ON-SHOT DIAGNOSTICS ALIGNMENT CHECK | S-AB-P-266 | |
UVDP CROSSHAIR TO CROSSHAIR ALIGNMENT CHECK | S-AB-P-265 | |
HED ALIGNMENT CHECK | S-AB-P-224 | |
HED CABINET FILTER CHECK AND REPLACEMENT | S-AB-P-457 | |
UVDP CALORIMETER CLIP CHECK PROCEDURE | S-AB-P-396 | |
UV CALORIMETER MIRRORS, HED MIRROR AND ASP MIRROR REFLECTANCE TEST | S-AB-P-336 | |
UVDP NF IRIS CHECK PROCEDURE | S-AB-P-270 | |
UVDP NF CALIBRATION IMAGE PROCEDURE | S-AB-P-267 | |
UVDP NF LENS RE-FOCUSING | S-AB-P-279 | |
UVDP FF CALIBRATION IMAGE PROCEDURE | S-AB-P-268 | |
UVDP FF LENS RE-FOCUSING | S-AB-P-278 | |
SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES | S-AB-P-112 | |
UV Transport Mirrors and Focusing Optics | ||
CW BEST FOCUS | S-AB-P-645 | |
UV FINAL OPTIC REFLECTIVITY MEASUREMENT | S-AB-P-646 | |
ADJUSTING THE COARSE ACTUATORS ON THE LARGE OPTIC MOUNTS | S-AB-P-426 | |
UV CENTERING CHECK TO THE FOCUS LENS | S-AB-P-717 | |
UVHR1 AND UVHR2 MIRROR LIMITS CHECK | S-AB-P-718 | |
SP Maintenance | ||
GCC | ||
TGA MONITORING CHECK | S-AB-P-281 | |
TGA HIGH POTENTIAL CHECK | S-AB-P-280 | |
COMPRESSOR WEEKLY ALIGNMENT CHECK | S-AB-P-552 | |
GCC VENTING PROCEDURE | S-AB-P-205 | |
PREPARATION FOR MANNED ENTRY OF THE GCC | S-AB-P-401 | |
INSTALLING THE BEAM COMBINER REFERENCE | S-AB-P-702 | |
GCC DEVICE CURRENT MEASUREMENTS | S-AB-P-686 | |
GCC SLIDES CLEANING AND INSPECTION | S-AB-P-648 | |
GETTER AND GRATING WITNESS PLACEMENT IN THE GCC | S-AB-P-652 | |
GCC GETTER TRAY MAINTENANCE | S-AB-P-685 | |
SECURING THE GCC FOR PUMP-DOWN | S-AB-P-201 | |
POST GCC PUMP DOWN RECOVERY PROCEDURE | S-AB-P-337 | |
GRATING TILING IN GCC | S-AB-P-284 | |
FAR FIELD TILING IN GCC | S-AB-P-285 | |
FULL COMPRESSOR ALIGNMENT | S-AB-P-286 | |
SPDP WAXER WEDGE BEAM DUMP ALIGNMENT PROCEDURE | S-AB-P-657 | |
BEST COMPRESSION SEARCH | S-AB-P-474 | |
SPDP | ||
IRAT LASER FINE ALIGNMENT TO THE SPDP ASPS | S-AB-P-513 | |
SPDP TABLE ALIGNMENT PROCEDURE | S-AB-P-186 | |
SPDP LASER POWER OUTPUT POWER CHECK | S-AB-P-291 | |
SPDP DIAGNOSTIC ALIGNMENT CHECK | S-AB-P-289 | |
SPDP WCS REFERENCE WAVEFRONT ACQUISITION PROCEDURE | S-AB-P-464 | |
SPDP WAVEFRONT CONTROL SYSTEM CALIBRATION | S-AB-P-290 | |
SPDP SPATIAL FILTER PUMPDOWN | S-AB-P-628 | |
HCD TABLE ALIGNMENT CHECK | S-AB-P-443 | |
HCD DIODE CALIBRATION | S-AB-P-442 | |
SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES | S-AB-P-112 | |
PAD | ||
PAD CONFIGURATION PROCEDURE | S-AB-P-597 | |
FSM | ||
FSM SHOT ALIGNMENT PROCEDURE | S-AB-P-653 | |
FSM CONFIGURATION PROCEDURE | S-AB-P-613 | |
SP Targeting | ||
SHORT PULSE TRANSPORT AND FOCUSING PROCEDURE | S-AB-P-541 | |
RATIOMETER BALL CLEANING & INSPECTION | S-AB-P-678 | |
General Diagnostics | ||
BEAMLINES ND FILTER CHECK AND CLEANING | S-AB-P-512 | |
Scientific Cameras | ||
CCD CAMERA VACUUM PRESSURE CHECK | S-AB-P-242 | |
CCD CAMERA PUMPDOWN | S-AB-P-243 | |
CCD & PEPC CHILLER COOLANT FILLING MAINTENANCE PROCEDURE | S-AB-P-259 | |
SCIENTIFIC CAMERA CHILLER FLUSH MAINTENANCE | S-AB-P-257 | |
SI-800 SNOUT ASSEMBLY PROCEDURE | S-AB-P-594 | |
ASSEMBLY OF LLE SNOUT TO SI800 CAMERA | S-AB-P-398 | |
PROCEDURE TO HARD-TIME A SI-800 CCD CAMERA IN OMEGA EP | S-AB-P-140 | |
Calorimeters | ||
CALORIMETER CALIBRATION SINGLE POINT CHECK | S-AB-P-428 | |
CALORIMETER CALIBRATION SERIES PROCEDURE | S-AB-P-429 | |
Maintenance Shot Procedures | ||
CAVITY HOLD-OFF TEST | S-AB-P-054 | |
BEAMLINES NF AND ED CALIBRATION PROCEDURE | S-AB-P-486 | |
INJECTION THROTTLE CALIBRATION | S-AB-P-640 | |
HED CALIBRATION | S-AB-P-632 |