CART MAINTENANCE ROOM |
CMR Manifold and GUI Operation |
Q-CM-P-004 |
CMR Organization and Radiological Policies |
Q-CM-P-005 |
Gate Valve And Upper Spool Removal And Installation |
Q-CM-P-006 |
CHARACTERIZATION STATIONS |
Leak Check Station |
Q-CS-P-007 |
Rocket Alignment Check |
Q-CS-P-008 |
Camera Alignment With Grid Targets |
Q-CS-P-009 |
Rocket Alignment Fixture Maintenance |
Q-CS-P-010 |
Clean, Inspect, And Lube Docking Plate |
Q-CS-P-011 |
Camera Alignment To TCC |
Q-CS-P-012 |
Cryogenic Target Characterization Station, Imaging |
Q-CS-P-016 |
Running CDA (CRYO Defect Analysis) Program |
Q-CS-P-017 |
Layer Quality Reporting Through A Shot Cycle |
Q-CS-P-018 |
FILL and TRANSFER STATIONS |
FTS AUTO ISOLATION INTERLOCK TEST PROCEDURE |
Q-FT-P-009 |
FTS#1 Cryostat Decontamination Procedure |
Q-FT-P-010 |
SUMITOMO Cryocooler Rebuild Procedure |
Q-FT-P-011 |
SUMITOMO Compressor Absorber Replacement |
Q-FT-P-065 |
Auxiliary Base/Dome Vacuum Space Pumping Station |
Q-FT-P-089 |
Permeation Cell Sealing Gasket Polishing Procedure |
Q-FT-P-090 |
ROOM 157 Oxygen Deficiency Meter Annual Maintenance |
Q-FT-P-091 |
FTS Glovebox Decontamination Procedure |
Q-FT-P-092 |
FTS#1 Glovebox Deaeration Procedure |
Q-FT-P-093 |
FTS#1 Interior Turbo Pump Replacement |
Q-FT-P-166 |
FTS#2 Microscope Procedure |
Q-FT-P-270 |
FTS#2 Decontamination Procedure |
Q-FT-P-271 |
C&TF Fill Systems Daily Checks |
Q-FT-P-274 |
Replacing FTS#1 Base/Dome Flange O-Ring |
Q-FT-P-279 |
CTHS GENERAL |
SCHEDULE OF TASKS FOR ORDERLY SHUTDOWN OF C&TF SYS |
Q-GN-P-023 |
Securing And Restarting MCTC And Related Systems F |
Q-GN-P-024 |
Room 157 Access Instructions |
Q-GN-P-025 |
HIGH PRESSURE FILL STATIONS |
DTHPS; 1000 ATM GAUGE MRC |
Q-HP-P-004 |
DTHPS ZB-8930 Regeneration MRC |
Q-HP-P-005 |
Vol VI Section 3.2 2nd Containment Leak Check MRC |
Q-HP-P-006 |
Vol VI Section 3.1; Syringe Pump Oil Degassing MRC |
Q-HP-P-007 |
Removing D2 from the DTHPS/TFS And Transferring To |
Q-HP-P-008 |
Replacing DTHPS POV-2153 |
Q-HP-P-009 |
Evacuation of TK-2160 to High DT VAC Manifold |
Q-HP-P-011 |
DTHPS Glovebox Decontamination |
Q-HP-P-013 |
DTHPS Glovebox De-Aeration Procedure |
Q-HP-P-014 |
Leak Test FTS-DTHPS Emergency Return Line |
Q-HP-P-016 |
Charging The DTHPS Primary Piping With High Pressu |
Q-HP-P-017 |
Opening And Closing DTHPS Large Containment Space |
Q-HP-P-018 |
DTHPS Gas Side Leak Pressure Sensor Test |
Q-HP-P-021 |
Procedure to Verify DT High Pressure Fill System P |
Q-HP-P-022 |
DTHPS Oil Side Leak Pressure Sensor Test |
Q-HP-P-023 |
DT High Pressure Fill Containment System Interlock |
Q-HP-P-024 |
DT High Pressure Fill Heartbeats Test Procedure |
Q-HP-P-025 |
DT High Pressure Fill State System Tritium Monitor |
Q-HP-P-026 |
DTHPS Fill State Machine Test of AOXG Interlock |
Q-HP-P-027 |
High Pressure Testing Of The DTHPS Primary Piping |
Q-HP-P-056 |
Replacing DTHPS POV-2150/MV-2150 Valve Assembly |
Q-HP-P-063 |
LA CAVE |
Vol VI, Section 11.2.1.2; Changing LP Clamps MRC |
Q-LC-P-005 |
Vol VI Section 11.7.1; Clear Moving Cryostat From |
Q-LC-P-006 |
Vol VI, Section 11.05.01.02 Chain Locker Lift Cha |
Q-LC-P-007 |
Clean & Lubricate Docking Plate |
Q-LC-P-008 |
Inspect Lower Pylon And Guide Rails |
Q-LC-P-009 |
Inspect Chain Guide Tube Rail |
Q-LC-P-010 |
Inspect Spool 5 Guide Rail |
Q-LC-P-012 |
MCTC Umbilical Tensioning At TCC |
Q-LC-P-013 |
Procedure For Cleaning Spool 5 Gate Valve In-Situ |
Q-LC-P-014 |
CTHS LN2 SYSTEM AND UTILITIES |
VP-4500 MECHANICAL OIL CHANGE |
Q-LN-P-001 |
VP-4500 Diffusion Oil Change |
Q-LN-P-002 |
MCTC 208VAC Power Cable Thermal Imaging Annual Che |
Q-LN-P-004 |
MCTC |
VP-4500 Mechanical Oil Change |
Q-LN-P-001 |
VP-4500 Diffusion Oil Change |
Q-LN-P-002 |
MCTC 208VAC Power Cable Thermal Imaging Annual Che |
Q-LN-P-004 |
REPLACE MCTC AIR CASTERS |
Q-MC-P-027 |
MCTC Exchange Gas Transducer Calibration Check |
Q-MC-P-028 |
Evaluate Overall MCTC Leak Rate |
Q-MC-P-029 |
Evaluate MCTC Fine Motion Stage Current |
Q-MC-P-030 |
Evaluate MCTC Pressure Relief Venting |
Q-MC-P-031 |
Inspect 208vac Power Connectors on MCTCS |
Q-MC-P-032 |
MCTC 208V Power Spooler Reel and Cable Inspection |
Q-MC-P-033 |
Inspect Spooled Air Hoses |
Q-MC-P-034 |
Short Lift Elevator Chain Tension Check |
Q-MC-P-035 |
Planar Readiness (Pre-Post) Checks |
Q-MC-P-036 |
Post Cold Checks (Spherical) |
Q-MC-P-037 |
Clean 16″ Chain Clamp and Check O-Ring |
Q-MC-P-038 |
Replace PLC Batteries: MCTC, CS, CMR, Lower Pylon |
Q-MC-P-042 |
Exchange Gas Transducer Check (External) |
Q-MC-P-043 |
MCTC He Manifold Maintenance |
Q-MC-P-047 |
MCTC Decontamination |
Q-MC-P-048 |
Pump/Purge He Exchange Gas |
Q-MC-P-049 |
Remove/Replace 16″ Gate Valve |
Q-MC-P-050 |
Inspect Floor Guide Rails (MCTC) |
Q-MC-P-051 |
Operation Of Backup Air For MCTC Air Casters |
Q-MC-P-052 |
Leak Check MCTC Backing Manifold (Spherical) |
Q-MC-P-053 |
Leak Check MCTC Backing Manifold (Planar) |
Q-MC-P-054 |
Remove/Replace Lower Shroud |
Q-MC-P-055 |
Remove/Replace the Cold Head |
Q-MC-P-056 |
Remove/Replace the Umbilical Spooler |
Q-MC-P-057 |
Power Up/Power Down an MCTC |
Q-MC-P-058 |
Preparing an MCTC For Service (Spherical) |
Q-MC-P-059 |
MCTC Pre Transfer Checks (Spherical) |
Q-MC-P-060 |
Calibrate Lakeshore Controller |
Q-MC-P-061 |
Check MCTC Shroud Window Transmission |
Q-MC-P-062 |
MCTC Compressor Maintenance |
Q-MC-P-065 |
Charging the MCTC Cryo Compressor |
Q-MC-P-066 |
MCTC Umbilical Tension Check |
Q-MC-P-068 |
MCTC 208VAC Power Cable Thermal Imaging Annual Che |
Q-MC-P-086 |
Check Shroud Windows for Cleaning |
Q-MC-P-087 |
Spherical MCTC Post Shot Checklist |
Q-MC-P-088 |
Employing Special Camera Shroud ror Planar Cryo Ta |
Q-MC-P-089 |
Calibrate Planar Cryo Cart Lakeshore Controllers |
Q-MC-P-090 |
Calibrating the MCTC Clamp Load Cell |
Q-MC-P-095 |
Procedure to replace MC cryocooler |
Q-MC-P-100 |
MCTC Cryocooler Replacement Procedure |
Q-MC-P-105 |
MCTC On Cart Viewing Procedure |
Q-MC-P-114 |
Removing/Replacing the MCTC Upper and Lower Spooler Covers |
Q-MC-P-150 |
Cryo (He) Compressor Adsorber Replacement |
Q-MC-P-151 |
Upper Shroud Assembly Procedure |
Q-MC-P-152 |
CTHS RADIOLOGICAL |
Vol VI S9; Contamination Surveys |
Q-RD-P-001 |
Glovebox Maintenance |
Q-RD-P-002 |
Replace Glovebox Gloves |
Q-RD-P-003 |
Part Cleaning Procedure |
Q-RD-P-004 |
Part Decontamination |
Q-RD-P-005 |
Overhoff Tritium Air Sampler Operation |
Q-RD-P-006 |
Replace Air Pump & Rotameter/Calibrate Flow |
Q-RD-P-007 |
Sampling Requirements for TRS Chilled Water |
Q-RD-P-008 |
Verification Of TMT-1002 And Automatic EMOG Response |
Q-RD-P-009 |
Procedure to Certify Tritium Monitor Performance |
Q-RD-P-010 |
Radiological Materials Audit Procedure |
Q-RD-P-011 |
Weekly Radiological Survey Checklist |
Q-RD-P-012 |
Sample DTHPS Hydraulic Fluid for Activity |
Q-RD-P-014 |
Procedure for Recording Responses or C&TF Process |
Q-RD-P-015 |
VerifyFlow and Check Calibration of FT-1001 for R |
Q-RD-P-016 |
Shipping essel Condensate Sampling Procedure |
Q-RD-P-018 |
TC-TRS High Activity Condensate Sampling |
Q-RD-P-019 |
TRITIUM FILL STATION |
Calibration of PT1A |
Q-TF-P-004 |
Calibration Procedure for TFS TE-1A and TE-1B |
Q-TF-P-006 |
Replace TFS Glovebox Cleanup Beds |
Q-TF-P-009 |
Hoppe Target Mounting Procedure |
Q-TF-P-011 |
NB-501, ZB-501 Yearly Replacement |
Q-TF-P-022 |
Test TFS PLC UPS/ TMT-1000 (FEMTOTECH) UPS |
Q-TF-P-023 |
Hoppe Target Shipping Container Packaging Instruct |
Q-TF-P-025 |
Charge T2 Sample Cylinder to a TFS Uranium Bed |
Q-TF-P-026 |
Procedure for Acquiring and Handling a DT Inventor |
Q-TF-P-028 |
Checklist for Room Temp DT Target Transfer Operato |
Q-TF-P-029 |
Procedure for Passing Equipment Through TFS Gloveb |
Q-TF-P-030 |
Charge Multiple T2 Sample Cylinder to a TFS Uranium |
Q-TF-P-031 |
Replacing Uranium Beds in the Tritium Fill Station |
Q-TF-P-049 |
3-He Filling Procedure |
Q-TF-P-067 |
Receiving and Handling DT Filled Plastic Shells FI |
Q-TF-P-154 |
Ambient DT Plastic Target Mounting In Hoppe Gloveb |
Q-TF-P-155 |
Transfer DT from Shipping UBED (USB) TO 500CC Vess |
Q-TF-P-162 |
Master Procedure for Transfer DT into and out of T |
Q-TF-P-214 |
TFS Glovebox Decontamination Procedure |
Q-TF-P-232 |
TFS Glovebox Deaeration Procedure |
Q-TF-P-239 |
Procedure for Mounting DT Filled Shells on Stalks |
Q-TF-P-307 |
Hoppe Glove Box Start & Stop |
Q-TF-P-309 |
Annual Calibration of TFS PT-55 |
Q-TF-P-314 |
TRITIUM RECOVERY |
ANNUAL TESTING TC-TRS DPT-8601 |
Q-TR-P-007 |
TC-TRS Chilled Water Replacement |
Q-TR-P-008 |
TC-TRS Pressure Relief Valve Replacement and Testi |
Q-TR-P-015 |
AOXG Copper Bed Replacement Procedure |
Q-TR-P-020 |
Oxygen Sampling of the Room 157 TRS Train #1 and T |
Q-TR-P-024 |
Oxygen Meter Validation Procedure |
Q-TR-P-025 |
Installation And Verification Of Room Tritium Moni |
Q-TR-P-027 |
Conditioning New ZRFE Getter Beds |
Q-TR-P-033 |
ROOM 157 Condensate and Shipping Container Account |
Q-TR-P-036 |
AOXG Bed Replacement Procedure |
Q-TR-P-040 |
Daily Checks on the Room 157 Tritium Removal System |
Q-TR-P-042 |
Mechanical Support for TC-TRS Recycle Valve |
Q-TR-P-043 |
TC-TRS Miscellaneous Maintenance Procedures |
Q-TR-P-046 |
Chiller Air Filter & Glycol Checks |
Q-TR-P-047 |
Room & Bottle Locker Hydrogen & Air Flow Checks |
Q-TR-P-048 |
Tritium Monitor Checks |
Q-TR-P-049 |
Rm157 TRS Glovebox Cleanup System Maintenance (AOXG sub-system) |
Q-TR-P-084 |
TRITIUM CONTROLS/ MANAGEMENT/ INTERLOCKS |
Tritium Scrubber Tritium Monitor Testing |
Q-TT-M-015 |
C&TF Gate TC-TRS Tritium Monitor Testing |
Q-TT-P-012 |
Procedure for Annual Testing of Responses of C&TF |
Q-TT-P-013 |
CTHS VACUUM SYSTEM |
VP-4320 CLEAN HE (FTS#1; XDS10 PUMP) |
Q-VC-P-003 |
VP-4340 Air Vac (FTS#1; XDS10 PUMP) Tip Seal Repla |
Q-VC-P-004 |
VP-4501LN2 Exhaust (FTS#1; XDS-10 Pump) Tip Seal R |
Q-VC-P-005 |
FTS2 XDS-10 Tip Seal Replacement |
Q-VC-P-006 |
Servicing Cart Maintenance Room XDS 10 Vacuum Pump |
Q-VC-P-007 |
Service P-5290 Lower Pylon Backing Pump |
Q-VC-P-008 |
Filter Replacement Procedure for FTS#1 Clean He An |
Q-VC-P-009 |
Maintenance Procedure for FTS#1 Metal Bellows 2nd Containment port check |
Q-VC-P-010 |
Metal Bellows Pump MBP-4313 Replacement Procedure |
Q-VC-P-011 |
MBP-4303 Replacement Procedure |
Q-VC-P-012 |
Metal Bellows MB-158 41419 Maintenance Procedure |
Q-VC-P-013 |