OMEGA EP Construction
-
Crane
Crane
Parts brought into the OMEGA EP Bay by crane (5/22/2006)
-
Entering OMEGA EP Bay
Entering OMEGA EP Bay
Parts brought into the OMEGA EP Bay by crane (3/20/2006)
-
Target Chamber
Target Chamber
Target Chamber being lowered into place (11/15/2005)
-
Target Chamber
Target Chamber
Target Chamber entering OMEGA EP bay (11/04/2005)
-
Target Chamber
Target Chamber
Target Chamber being brought into the OMEGA EP Bay by crane (11/04/2005)
-
Laser Bay
Laser Bay
Laser Bay (10/24/2005)
-
Grating Compressor Chamber
Grating Compressor Chamber
Assembling the target area structure (10/24/05)
-
Grating Compressor Chamber
Grating Compressor Chamber
Grating compressor chamber module arrives (8/22/05)
-
Module Entering Bay
Module Entering Bay
Module entering the bay via crane (8/22/05)
-
Module Entering Bay
Module Entering Bay
Module entering the bay via crane (8/22/05)
-
Target Area Structure
Target Area Structure
Assembling the target area structure (6/22/05)
-
Target Area Structure
Target Area Structure
Assembling the target area structure (6/14/05)
-
Target Area Structure
Target Area Structure
Installing the target area structure (6/10/05)
-
Target Area Structure
Target Area Structure
Lining up the first pieces of the target area structure (5/16/05)
-
Laser Bay
Laser Bay
OMEGA EP Laser Bay (5/06/05)
-
Viewing Gallery
Viewing Gallery
The empty OMEGA EP Laser Bay from the viewing gallery (3/16/05)
-
Marking the Floor
Marking the Floor
Marking the floor of the bay (1/25/05)
-
Sidewalk
Sidewalk
Pouring concrete for the sidewalk (12/09/04)
-
Laser Bay Floor
Laser Bay Floor
Working on the floor of the laser bay (11/04/04)
-
Laser Bay Ceiling
Laser Bay Ceiling
Working on the ceiling of the laser bay (10/22/04)
-
Scaffolding
Scaffolding
Scaffolding ouside of the laser bay (8/27/04)
-
Construction
Construction
Building exterior (7/22/04)
-
Laser Bay
Laser Bay
Inside of the laser bay (6/24/04)
-
Building Exterior
Building Exterior
Constructing the exterior of the building (6/16/04)
-
Construction
Construction
Building construction (5/21/04)
-
Construction
Construction
Building construction (4/27/04)
-
Installing Crane
Installing Crane
Installing crane in laser bay ceiling (3/30/04)
-
Construction
Construction
Building construction (3/29/04)
-
Pouring Concrete
Pouring Concrete
Pouring concrete for laser bay floor (3/25/04)
-
Construction Continues
Construction Continues
Building construction (2/13/04)
-
Construction Underway
Construction Underway
Building construction (2/12/04)
-
Winter Construction
Winter Construction
Building construction (1/20/04)
-
Aerial View
Aerial View
Aerial view of building construction (12/19/03)
-
Pouring Concrete
Pouring Concrete
"574 yards in 5 hours"-- The amount of concrete used to pour the first third of the capacitor bay floor (11/23/03)
-
Construction Begins
Construction Begins
Clearing the site (9/11/03)
-
Groundbreaking
Groundbreaking
Groundbreaking for OMEGA EP (8/08/03)