Chapter 7 - Experimental
Volume X Subsystem and Component Maintenance
Beamline Nitrogen Supply
- Humidity Sensor Probe Replacement (S-AB-P-164)
- Beamline Enclosure Nitrogen 'Low-flow' Rate Adjustment (S-AB-P-167)
TAS and GCC
- TAS and GCC Platform Tightening (S-AB-P-182)
- GCC Cryogenic Pump Regeneration Process (S-AB-P-447)
- GCC Hoist Installation and Removal Procedure (S-AB-P-487)
Target Chamber
- ESO Checklist for EP Target Chamber Entry (S-AB-P-192)
- CTI Cryogenic Pump Regeneration Process (S-AB-P-399)
TVS
- TVS Maintenance - Vacuum TCC Calibration (S-AB-P-277)
- Target Viewing System Maintenance Distortion Calibration (S-AB-P-458)
- Target Viewing system Maintenance TVS Shutter Assembly Replacement (S-AB-P-459)
- EP Target Viewing System Maintenance Focus Stage Calibration (S-AB-P-480)
TPS
- TPS Shuttle Recovery Procedure (S-AB-P-350)
- Target Positioning System Maintenance Target Positioning Shuttle (TPS) PM (S-AB-P-485)
TIM