Chapter 4 - Beamlines Operating Procedures

Volume VIII System Shot Operations Manual, S-AB-P-007

 

 

Shot Operation Procedures

 

Start Up/Shut Down Procedures

 

Support Procedures

 

Maintenance Procedures

 

 

 

 

Shot Operation Procedures

 

  Pre-Ops, Watch Relief, Securing
S-AB-P-156 BEAMLINES OPERATOR PRE-OPERATIONS CHECKLIST
S-AB-P-155 ALIGNMENT TECHNICIAN PRE-OPERATIONS CHECKLIST
S-AB-P-523 BEAMLINES WATCH RELIEF CHECKLIST
S-AB-P-482 BEAMLINES DAILY SECURING CHECKLIST
   
  Shot Checklists
S-AB-P-125 SHOT TYPE 2: BLO NON-PROPAGATING CHECKLIST
S-AB-P-145 SHOT TYPE 2: ALT NON-PROPAGATING CHECKLIST
S-AB-P-124 SHOT TYPE 3: BLO PROCEDURE
S-AB-P-126 SHOT TYPE 4A/5A: BLO CHECKLIST FOR LONG-PULSE OPERATION TO THE SWITCHYARD CAL
S-AB-P-148 SHOT TYPE 4B/5B: BLO CHECKLIST FOR SHORT-PULSE OPERATION TO THE SWITCHYARD CAL
S-AB-P-241 SHOT TYPE 4C/5C: BLO CHECKLIST FOR LONG-PULSE OPERATION TO THE UV-DBS BEAM DUMP
S-AB-P-230 SHOT TYPE 4D/5D: BLO CHECKLIST FOR SHORT-PULSE OPERATION TO THE GCC CAL
S-AB-P-590 SHOT TYPE 4E: BLO CHECKLIST FOR SHORT PULSE OPERATION TO TC (FSM)
S-AB-P-611 SHOT TYPE 4T: BLO CHECKLIST FOR SP TIMING SHOTS TO THE TC
S-AB-P-214 SHOT TYPE 6: BLO CHECKLIST FOR LONG PULSE OPERATION TO TC
S-AB-P-212 SHOT TYPE 7: BLO CHECKLIST FOR SHORT PULSE OPERATION TO TC
S-AB-P-129 BEAMLINES ABORT AND POSTSHOT CHECKLISTS
S-AB-P-418 ALT PROPAGATING SHOT CHECKLIST
   
  Sweep Checklists
S-AB-P-199 EP CLOSED ACCESS SWEEP CHECKLIST
S-AB-P-200 EP CLOSED ACCESS SWEEP FOR OMEGA TYPE 7B SHOT
S-AB-P-465 EP BAY 4WPROBE LASER SWEEP PROCEDURE
S-AB-P-655 DIAGNOSTIC BAY CLOSED ACCESS CHECKLIST
S-AB-P-538 CAPACITOR BAY SWEEP CHECKLIST
S-AB-P-582 EP BAY AND OAA SECURING WALKTHROUGH
S-AB-P-515 GCC SWEEP PROCEDURE

 

 

Start Up/Shut Down Procedures

 

Lasers
S-AB-P-638 IRAT IPG LASER STARTUP AND SHUTDOWN PROCEDURE
S-AB-P-042 SPDP LASER STARTUP PROCEDURE
S-AB-P-043 SPDP LASER SHUTDOWN PROCEDURE
S-AB-P-109 PAD LASER STARTUP AND SHUTDOWN PROCEDURE
S-AB-P-151 UVAT LASER STARTUP AND SHUTDOWN PROCEDURE
S-AB-P-040 IRAT LASER STARTUP PROCEDURE
S-AB-P-041 IRAT LASER SHUTDOWN PROCEDURE
S-AB-P-460 PAD TABLE LASER STARTUP/SHUDOWN PROCEDURE
 
PEPC
S-AB-P-136 PEPC SOFTWARE STARTUP AND SHUTDOWN
S-AB-P-333 PEPC HARDWARE STARTUP AND SHUTDOWN
S-AB-P-135 STARTUP OF THE PEPC HIGH VOLTAGE SYSTEM
 
WCS
S-AB-P-127 WCS SOFTWARE STARTUP & SHUTDOWN
S-AB-P-134 DEFORMABLE MIRROR HARDWARE STARTUP AND SHUTDOWN PROCEDURES
 
DIAGNOSTICS
S-AB-P-246 TSF OTDR SCOPE STARTUP AND SHUTDOWN PROCEDURE
S-AB-P-113 BEAMLINES SCIENTIFIC CAMERA STARTUP AND SHUTDOWN
S-AB-P-456 HED HARDWARE STARTUP AND SHUTDOWN

 

 

 

Support Procedures

 

  LP Alignment Procedures
S-AB-P-111 IRAT AND SOURCES INJECTION ALIGNMENT PROCEDURE
S-AB-P-209 MAIN BEAMLINE 4-PASS MODE ALIGNMENT PROCEDURE
S-AB-P-273 MAIN BEAMLINE 2-PASS MODE ALIGNMENT
S-AB-P-223 IRAT TO UVDP ALIGNMENT 
S-AB-P-211 UV TARGETING PROCEDURE
S-AB-P-483 UV DAILY STARTUP ALIGNMENT CHECK
   
  SP Alignment Prcoedures
S-AB-P-111 IRAT AND SOURCES INJECTION ALIGNMENT PROCEDURE
S-AB-P-209 MAIN BEAMLINE 4-PASS MODE ALIGNMENT PROCEDURE
S-AB-P-273 MAIN BEAMLINE 2-PASS MODE ALIGNMENT
S-AB-P-184 SPDP STARTUP ALIGNMENT CHECK
S-AB-P-196 COMPRESSOR DAILY POINTING CHECK
S-AB-P-197 IRAT/OPCPA TO SPDP ALIGNMENT CHECK
S-AB-P-412 SPDP NF CAMERA IMAGE USING THE TSF PASS-4 FIBER
S-AB-P-639 SPDP WCS WAVEFRONT CORRECTION WITH PASS-4 FIBER PROCEDURE
S-AB-P-542 SHORT PULSE RETRO TARGETING PROCEDURE
S-AB-P-541 SHORT PULSE TRANSPORT AND FOCUSING PROCEDURE
S-AB-P-626 SHORT-PULSE CO-PROP TARGETING
   
  Alignment Support Procedures
S-AB-P-138 WCS WAVEFRONT CORRECTION PROCEDURE
   
  Ratiometer Procedures
S-AB-P-094 UV RATIOMETER MEASUREMENT
S-AB-P-631 IR RATIOMETER MEASUREMENT
   
  Beamline Environment Procedures
S-AB-P-245 MAIN BEAMLINE SPATIAL FILTER VENT & PUMP PROCEDURE
S-AB-P-152 BEAMLINE ENCLOSURE ACCESS PROCEDURES
   
  Power Outage Checklists
S-AB-P-608 BEAMLINES PLANNED POWER OUTAGE RECOVERY
S-AB-P-609 BEAMLINES PRE-ELECTRICAL SHUTDOWN CHECKLIST
S-AB-P-610 BEAMLINES UNPLANNED POWER OUTAGE RECOVERY
   
  Other
S-AB-P-516 GCC ACCESS
S-AB-P-647 BEAMLINES ETP SETUP AND RECOVERY

 

 

 

Maintenance Procedures

 

  Main Beamlines Maintenance
  IRAT
S-AB-P-255 IRAT POWER OUTPUT CHECK
S-AB-P-256 IRAT TABLE FINE ALIGNMENT MAINTENANCE
S-AB-P-640 INJECTION THROTTLE CALIBRATION
S-AB-P-354 CENTERING IRAT ENERGY ON APODIZER PROCEDURE
S-AB-P-331 IRAT REPLACEMENT PROCEDURE
S-AB-P-112 SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES
   
  TSF and CSF Vessel
S-AB-P-250 BEAMLINE ALIGNMENT PINHOLE TRACKING MAINTENANCE
S-AB-P-249 BEAMLINE ALIGNMENT PINHOLE REPLACEMENT
S-AB-P-327 BEAMLINE SHOT PINHOLE CENTERING MAINTENANCE
S-AB-P-641 TSF AND CSF SHOT PINHOLE REPLACEMENT PROCEDURE
S-AB-P-251 TSF & CSF CONICAL PINHOLE INSPECTION AND ALIGNMENT PROCEDURE
S-AB-P-352 BEAMLINE TSF & CSF ILLUMINATOR INTENSITY BALANCE
S-AB-P-229 TSF & CSF PVS ILLUMINATOR BULB REPLACEMENT PROCEDURE
S-AB-P-326 TSF & CSF PVS IMAGING ADJUSTMENT PROCEDURE
S-AB-P-356 BEAMLINE TSF INJECTION VACUUM WINDOW REPLACEMENT PROCEDURE
S-AB-P-330 INJECTION MIRROR REPLACEMENT PROCEDURE
S-AB-P-347 BEAMLINE FM1 OPTIC REPLACEMENT PROCEDURE
   
  Main Beamline
S-AB-P-253 BEAMLINE CENTERING CHECK AND CORRECTION
S-AB-P-167 BEAMLINE ENCLOSURE NITROGEN 'LOW-FLOW' RATE ADJUSTMENT
S-AB-P-165 NITROGEN FILTER CARTRIDGE INSPECTION AND REPLACEMENT
S-AB-P-164 BEAMLINE HUMIDITY SENSOR REPLACEMENT
S-AB-P-630 GAPODIZER CENTERING CHECK
S-AB-P-643 GAPODIZER BLADE REPLACEMENT
S-AB-P-426 ADJUSTING THE COARSE ACTUATORS ON THE LARGE OPTIC MOUNTS
S-AB-P-260 IR-DBS REMOVAL & INSTALLATION
   
  PEPC
S-AB-P-247 PEPC EMPTY GAS TANK CHECK
S-AB-P-221 PEPC GAS SUPPLY CYLINDER REPLACEMENT MAINTENANCE PROCEDURE
S-AB-P-244 PEPC SOLID STATE SWITCH PULSE GENERATOR LED MONITORING PM PROCEDURE
S-AB-P-220 PEPC TIMING MAINTENANCE PROCEDURE
S-AB-P-248 PEPC PROCESS GAS FILTER REPLACEMENT
S-AB-P-325 PEPC NITROGEN PURGE AND VACUUM PREP PROCEDURE
S-AB-P-334 PEPC VACUUM ISOLATION AND PUMPING PROCEDURE
S-AB-P-258 PEPC CHILLER FLUSH MAINTENANCE
S-AB-P-259 CCD & PEPC CHILLER COOLANT FILLING MAINTENANCE PROCEDURE
   
  WCS
S-AB-P-130 BEAMLINE WAVEFRONT CONTROL SYSTEM CALIBRATION PROCEDURE
S-AB-P-139 WCS REFERENCE WAVEFRONT ACQUSITION PROCEDURE
S-AB-P-290 SPDP WAVEFRONT CONTROL SYSTEM CALIBRATION
S-AB-P-464 SPDP WCS REFERENCE WAVEFRONT ACQUISITION PROCEDURE
S-AB-P-328 BEAMLINE DM TILT REMOVAL MAINTENANCE PROCEDURE
S-AB-P-476 WCS PID FILE CREATION
S-AB-P-261 DEFORMABLE MIRROR HARDWARE VOLTAGE CALIBRATION
S-AB-P-329 IRDP WAVEFRONT SENSOR REGISTRATION MAINTENANCE PROCEDURE
   
  IRDP
S-AB-P-254 IRDP OUTPUT PATH ALIGNMENT MAINTENANCE
S-AB-P-112 SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES
   
  UV Maintenance
  UVAT
S-AB-P-483 UV DAILY STARTUP ALIGNMENT CHECK
S-AB-P-262 UVAT LASER OUTPUT CHECK
S-AB-P-227 UVAT LASER OUTPUT WINDOW REPLACEMENT/CLEANING
S-AB-P-228 UVAT LASER DIODE POWER OUTPUT CHECK
S-AB-P-252 UVAT LARGE AND SMALL BEAM CO-ALIGNMENT
S-AB-P-193 UVAT MAINTENANCE ALIGNMENT CHECK
S-AB-P-263 UVAT COLLIMATION CHECK
S-AB-P-112 SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES
   
  LP Switchyard
S-AB-P-271 LP SY MIRROR CENTERING CHECK
   
  PMAs
S-AB-P-272 ACTUATE THE PMA3 LIFT/SLIDE
S-AB-P-171 PMA MAINTENANCE ALIGNMENT CHECK
   
  FCCs
S-AB-P-395 FCC ENCLOSURE CLEANING PROCEDURE
S-AB-P-612 FCC IR AND UV ALIGNMENT CHECK
S-AB-P-351 FCC RETRO-ALIGNMENT MAINTENANCE PROCEDURE
   
  UVDP
S-AB-P-264 UVAT TO UVDP ASPS CENTERING CHECK
S-AB-P-266 UVDP ON-SHOT DIAGNOSTICS ALIGNMENT CHECK
S-AB-P-265 UVDP CROSSHAIR TO CROSSHAIR ALIGNMENT CHECK
S-AB-P-224 HED ALIGNMENT CHECK
S-AB-P-457 HED CABINET FILTER CHECK AND REPLACEMENT
S-AB-P-396 UVDP CALORIMETER CLIP CHECK PROCEDURE
S-AB-P-336 UV CALORIMETER MIRRORS, HED MIRROR AND ASP MIRROR REFLECTANCE TEST
S-AB-P-348 UV CONTRAST SCOPE STARTUP AND SHUTDOWN
S-AB-P-270 UVDP NF IRIS CHECK PROCEDURE
S-AB-P-267 UVDP NF CALIBRATION IMAGE PROCEDURE
S-AB-P-279 UVDP NF LENS RE-FOCUSING
S-AB-P-268 UVDP FF CALIBRATION IMAGE PROCEDURE
S-AB-P-278 UVDP FF LENS RE-FOCUSING
S-AB-P-112 SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES
   
  UV Transport Mirrors and Focusing Optics
S-AB-P-645 CW BEST FOCUS
S-AB-P-646 UV GHOST ENERGY MEASUREMENTS
S-AB-P-426 ADJUSTING THE COARSE ACTUATORS ON THE LARGE OPTIC MOUNTS
   
   
  SP Maintenance
  GCC
S-AB-P-281 TGA MONITORING CHECK
S-AB-P-280 TGA HIGH POTENTIAL CHECK
S-AB-P-552 COMPRESSOR WEEKLY ALIGNMENT CHECK
S-AB-P-205 GCC VENTING PROCEDURE
S-AB-P-401 PREPARATION FOR MANNED ENTRY OF THE GCC
S-AB-P-644 GCC DEVICE CURRENT MEASUREMENTS
S-AB-P-648 GCC SLIDES CLEANING AND INSPECTION
S-AB-P-652 GETTER AND GRATING WITNESS PLACEMENT IN THE GCC
S-AB-P-201 SECURING THE GCC FOR PUMP-DOWN
S-AB-P-337 POST GCC PUMP DOWN RECOVERY PROCEDURE
S-AB-P-284 GRATING TILING IN GCC
S-AB-P-285 FAR FIELD TILING IN GCC
S-AB-P-286 FULL COMPRESSOR ALIGNMENT
S-AB-P-657 SPDP WAXER WEDGE BEAM DUMP ALIGNMENT PROCEDURE
S-AB-P-474 BEST COMPRESSION SEARCH
   
  SPDP
S-AB-P-513 IRAT LASER FINE ALIGNMENT TO THE SPDP ASPS
S-AB-P-186 SPDP TABLE ALIGNMENT PROCEDURE
S-AB-P-291 SPDP LASER POWER OUTPUT POWER CHECK
S-AB-P-289 SPDP DIAGNOSTIC ALIGNMENT CHECK
S-AB-P-464 SPDP WCS REFERENCE WAVEFRONT ACQUISITION PROCEDURE
S-AB-P-290 SPDP WAVEFRONT CONTROL SYSTEM CALIBRATION
S-AB-P-628 SPDP SPATIAL FILTER PUMPDOWN
S-AB-P-294 UTD/TESSA/SPDP POINTING CHECK
S-AB-P-443 HCD TABLE ALIGNMENT CHECK
S-AB-P-442 HCD DIODE CALIBRATION
S-AB-P-112 SMALL OPTICS INSPECTIONS ON DIAGNOSTIC TABLES
   
  PAD 
S-AB-P-597 PAD CONFIGURATION PROCEDURE
S-AB-P-296 PAD REFERENCE WAVEFRONT MEASUREMENT
   
  FSM
S-AB-P-653 FSM SHOT ALIGNMENT PROCEDURE
S-AB-P-613 FSM CONFIGURATION PROCEDURE
   
  SP Targeting
S-AB-P-541 SHORT PULSE TRANSPORT AND FOCUSING PROCEDURE
   
   
  General Diagnostics
S-AB-P-512 BEAMLINES ND FILTER CHECK AND CLEANING
   
  Scientific Cameras
S-AB-P-242 CCD CAMERA VACUUM PRESSURE CHECK
S-AB-P-243 CCD CAMERA PUMPDOWN
S-AB-P-259 CCD & PEPC CHILLER COOLANT FILLING MAINTENANCE PROCEDURE
S-AB-P-257 SCIENTIFIC CAMERA CHILLER FLUSH MAINTENANCE
S-AB-P-594 SI-800 SNOUT ASSEMBLY PROCEDURE
S-AB-P-398 ASSEMBLY OF LLE SNOUT TO SI800 CAMERA
S-AB-P-140 PROCEDURE TO HARD-TIME A SI-800 CCD CAMERA IN OMEGA EP
   
  Calorimeters
S-AB-P-428 CALORIMETER CALIBRATION SINGLE POINT CHECK
S-AB-P-429 CALORIMETER CALIBRATION SERIES PROCEDURE
   
   
  Maintenance Shot Procedures
S-AB-P-054 CAVITY HOLD-OFF TEST
S-AB-P-486 BEAMLINES NF AND ED CALIBRATION PROCEDURE
S-AB-P-640 INJECTION THROTTLE CALIBRATION