Chapter 4 - Beamlines
Volume IX Subsystem Startup and Shutdown Procedures (S-AB-P-013)
AT Checklists
ALT Checklists
- ALT Pre-Operations Checklist (S-AB-P-155)
- IRAT Startup Alignment Check (S-AB-P-111)
- UV Startup Alignment Check (S-AB-P-178)
- FCC Startup Retro-Alignment Check (S-AB-P-194)
- SPDP Startup Alignment Check (S-AB-P-184)
- UVAT to UVDP ASPs Centering Procedure (S-AB-P-264)
BLO Checklists
- Beamlines Operator Long Pulse Pre-operations Checklist (S-AB-P-156)
- BLO Short-pulse Pre-Operations Checklist (S-AB-P-146)
- Main Beamline Alignment Procedure (S-AB-P-209)
- Main Beamline 2-Pass Mode Alignment (S-AB-P-273)
- IRAT to SPDP Startup Alignment Check (S-AB-P-197)
- IRAT to UVDP Startup Alignment Check (S-AB-P-223)
- OPCPA to SPDP Startup Alignment Check (S-AB-P-198)
- Compressor Startup Alignment Check (S-AB-P-196)
Securing Checklists
- Amplifier Technician Shutdown Checklist (S-AB-P-142)
- Alignment Tech Securing Checklist (S-AB-P-132)
- Beamlines Operator Securing Checklist (S-AB-P-133)
- GCC and SPDP Securing Checklist (S-AB-P-208)
- Beamlines Daily Securing Checklist (S-AB-P-482)
Laser Startup/Shutdown
- LOTF Laser Startup (S-AB-P-038)
- LOTF Laser Shutdown (S-AB-P-039)
- IRAT Laser Startup (S-AB-P-040)
- IRAT Laser Shutdown (S-AB-P-041)
- SPDP Laser Startup (S-AB-P-042)
- SPDP Laser Shutdown (S-AB-P-043)
- PEPC Test Stand Laser Startup (S-AB-P-044)
- PEPC Test Stand Laser Shutdown (S-AB-P-045)
- PAD Laser Startup Procedure (S-AB-P-108)
- PAD Laser Shutdown Procedure (S-AB-P-109)
- UVAT Laser Startup and Shutdown Procedures (S-AB-P-151)
- UV Daily Startup Alignment Check (S-AB-P-483)
Software Startup/Shutdown
- Beamlines Scientific Camera Startup and Shutdown (S-AB-P-113)
- OAP Manipulator Software Startup and Shutdown (S-AB-P-188)
- TSF OTDR Scope Startup & Shutdown Procedure (S-AB-P-246)
Wavefront Control System
- Wavefront Control System Software Startup Procedure (S-AB-P-127)
- WCS Wavefront Correction Procedure (S-AB-P-138)
- Deformable Mirror Hardware Startup and Shutdown Procedures (S-AB-P-134)
PEPC System
- PEPC High Voltage System Startup and Shutdown (S-AB-P-135)
- PEPC Software Startup and Shutdown (S-AB-P-136)
- PEPC Convert between Single and Double Pulse (S-AB-P-318)
- PEPC Hardware Startup and Shutdown (S-AB-P-333)
PMA System
UV System
TGA System
- TGA Actuator Control System Startup and Shutdown (S-AB-P-095)
- Grating Tiling in Grating Compressor Chamber (S-AB-P-284)
- Full Compressor Alignment (S-AB-P-286)
GCC
HED
PAD