Maintenance Plans Section 7 - Experimental Operations
Personal Safety Procedures
- Bioassay (S-SM-P-113)
- Filter Mask Fit Check (S-SM-P-146)
- OMEGA Target Chamber Entry Procedure (S-SM-P-395)
Radiation Related Procedures
- Recover Target Debris from TC Floor (S-SM-P-054)
- Sample Target Chamber Environment for Beryllium (S-SM-P-055)
- Target Chamber Alpha Swipe (S-SM-P-056)
- Assay Exhaust Sample Activity (S-SM-P-071)
- Confirm Operation of Overhoff Tritium Air Sampler (S-SM-P-072)
- Replace Overhoff TASC Pump & Rotameter / Calibrate Flow (S-SM-P-073)
- Inspect Overhoff TASC Dust Filter (S-SM-P-074)
- Shield Monitors (S-SM-P-105)
- Target Chamber Activation (S-SM-P-106)
- Target Bay Activation (S-SM-P-107)
- Surface Contamination Survey (S-SM-P-108)
- TIM Dry Box Surface Contamination Survey (S-SM-P-109)
- TIM Radiation Survey (S-SM-P-110)
- TPS-2 Radiation Survey after DT Campaign (S-SM-P-111)
- Radioactive Material Inventory Audit (S-SM-P-112)
- Count Standard Source Using Tritium Protocol (S-SM-P-114)
- Back Up Wallac 1409 System Disk (S-SM-P-115)
- Wallac 1409 Manufacturer's Service (S-SM-P-116)
- Transfer Wallac 1409 Data Files (S-SM-P-117)
- Ludlum Model 3 Geiger Counter (S-SM-P-118)
- Overhoff 7000 SBAyC Tritium Monitor (S-SM-P-119)
- Ludlum Model 9 Ion Counter (S-SM-P-120)
- Ludlum Model 9 Inspect/Replace Disiccant Packages (S-SM-P-121)
Exhaust Stack Procedures
Target Chamber Vacuum Subsystem Procedures
- Inspect Viewing Window for Potential Mechanical Failures (S-SM-P-057)
- TC Vacuum Gauge Calibration Check (S-SM-P-058)
- EH1200 Blower Oil Levels (S-SM-P-059)
- EH1200 Blower Pump Connections (S-SM-P-060)
- EH1200 Blower Oil Change (S-SM-P-061)
- GV120 Gearbox Oil Level (S-SM-P-062)
- GV120 Pipelines and Connections (S-SM-P-063)
- GV120 Gearbox Oil & Sight-Glasses (S-SM-P-064)
- GV120 Relubricate Rotor Bearings (S-SM-P-065)
- GV120 Change Felt Head-Plate Filter (S-SM-P-066)
- Check TC Vacuum Pump Exhaust Filters (S-SM-P-067)
- CTI On-Board 400 Cryopump Adsorber Change (S-SM-P-068)
- Target Chamber RGA Scan (S-SM-P-378)
Spatial Filter Vacuum Subsystem Procedures
- EH500/EH4200 Blower Oil Level (S-SM-P-089)
- EH4200 Blower Inspect Pump (S-SM-P-090)
- GV600 Blower Oil Level (S-SM-P-091)
- GV600 Blower Gas Ballast, Pipes & Connections (S-SM-P-092)
- EH500 Blower Lubrication (S-SM-P-093)
- EH500/EH4200 Blower Oil Change (S-SM-P-094)
- GV600 Blower 18-Month Maintenance (S-SM-P-095)
- GV600 Blower Oil Change and Vent Filters (S-SM-P-096)
- GV600 Blower Overhaul (S-SM-P-097)
- GV600 Blower Replace Pump Motor (S-SM-P-098)
- Check/Tighten Spider Manifold Fasteners (S-SM-P-099)
- Replace Branch Isolation Valve Seals (S-SM-P-100)
Target Viewing System Procedures
- TVS-II Illumination Calibration (S-SM-P-370)
- TVS-II Calibration Data Collection (S-SM-P-373)
- TVS-II Changing TVS Calibration (S-SM-P-390)
- TVS-II Shutter Timing Procedure (S-SM-P-381)
- TVS-II Imperx Camera Replacement (S-SM-P-371)
Target Positioner Procedures
- Shuttle Rotation (S-SM-P-075)
- Re-Qualify Back-Up Shuttle (S-SM-P-076)
- Stalk Alignment Test (S-SM-P-079)
- Replace TPS2 Gate Valve (S-SM-P-080)
Ten Inch Manipulator Procedures
- Preconditions and Precautions - Install/Remove Break-Out Box (S-SM-P-122)
- Check/Tighten External Fasteners (S-SM-P-123)
- Check/Tighten Electrical Connections (S-SM-P-124)
- Check/Replace Drive Coupler (S-SM-P-125)
- Check/Repair Pneumatic Subsystem (S-SM-P-126)
- Check/Adjust Door Motions (S-SM-P-127)
- Check/Repair Door Seal (S-SM-P-128)
- Check/Tighten Internal Fasteners (S-SM-P-129)
- Check Valve Seal (w/o TC Entry) (S-SM-P-130)
- Replace Valve Seal (w/ TC Entry) (S-SM-P-131)
- Check/Repair Side Rollers (S-SM-P-132)
- Repeatability Test (S-SM-P-133)
- Leak and Rate of Rise Test (S-SM-P-134)
- TIM Monitor Cable Calibration (S-SM-P-145)
Upper Pylon Procedures
- Check and Correct UP Alignment (S-SM-P-153)
- Inspect Safety Rack & Engagement Cog (S-SM-P-154)
- Linear Motor - Inspect Servo Amplifier Contactors (S-SM-P-155)
- Check Vacuum Seal (S-SM-P-156)
- Check/Replace Pull Tube Bearings (S-SM-P-157)
- Replace Vacuum Seal (S-SM-P-158)
- Gripper Inspection (S-SM-P-159)
- Gripper Replacement Procedure (S-SM-P-376)
- MCTC Shroud Recovery Procedure (S-SM-P-396)
Target Diagnostic Procedures
- Diagnostic CCD Water Change (S-SM-P-135)
- Check Pointing of Neutron Temporal Diagnostic (S-SM-P-136)
- CPS Preconditions & Precautions (S-SM-P-137)
- CPS Clean and Lube Lead Screw (S-SM-P-138)
- CPS Check/Tighten Motor Coupler Screws (S-SM-P-139)
- CPS Clean Suie Rails and Bearing Surfaces (S-SM-P-140)
- CPS Check/Repair IP O-Ring (S-SM-P-141)
- CPS Clean & Wipe Down Interior Surfaces (S-SM-P-142)
- Replace IR Fiducial Diode Bias Battery (S-SM-P-143)
- Timing Diagnostic Oscilloscope Calibration (S-SM-P-144)
- Inspect/Repair XRFC Film Backs (S-SM-P-147)
- Inspect/Repair XRFC Nosecones (S-SM-P-148)
- XRFC Timing Calibration (S-SM-P-149)
- ASBO DI Water Filter Change (S-SM-P-150)
- ASBO DI Water Anti-Bacterial Treatment (S-SM-P-151)
- ASBO Flashlamp Replacement (S-SM-P-152)
- JOBO Vendor Maintenance (S-SM-P-160)
- DANTE Back Flange Maintenance (S-SM-P-365)
- DANTE Filter Inspection and Servicing (S-SM-P-366)
- DANTE Venting and Pumping (S-SM-P-367)
- SCCAL Vacuum Maintenance and Pumpdown (S-SM-P-369)
- NDI – MRS Alignment (S-SM-P-377)