OMEGA EP Laser Facility > Documentation > Volume VIII System Shot Operations Manual > S-AB-P-007 - Chapter 4 - Beamlines Operating Procedures
S-AB-P-125(A): Shot Type 2: BLO Non-Prop Procedure
S-AB-P-145(A): Shot Type 2: ALT Non-Prop Checklist
S-AB-P-124(G): Shot Type 3: BLO Procedure
S-AB-P-131(G): Shot Type 3: ALT Checklist
S-AB-P-126(F): Shot Type 4a/5a: BLO Checklist for Long-pulse Operation to the Switcyard Calorimeter
S-AB-P-148(B): Shot Type 4b/5b: BLO Checklist for Short-pulse Operation to the Switcyard Calorimeter
S-AB-P-230(A): Shot Type 4d/5d: BLO Checklist for Short-pulse Operation to the GCC Calorimeter
S-AB-P-147(H): Shot Type 4/5: ALT Configuration Checklist
S-AB-P-214(B): Shot Type 6: BLO Checklist
S-AB-P-212(A): Shot Type 7: BLO Checklist for Short-pulse Operation
S-AB-P-213(C): Shot Type 6/7: ALT Configuration Checklist
S-AB-P-199: EP Bay Sweep Procedure
S-AB-P-200(A): ALT Sweep for OMEGA Type 7b Shots
S-AB-P-129(A): Beamlines Abort and Postshot Checklists
Revised last: October 10, 2008
Address document comments, questions, and corrections to Operations Anaylst .