OMEGA Laser Facility > Documentation > Volume V - CTHS System Operation Procedures
Cryogenic Target Handling System - Volume V -- System Operation Procedures (S-AA-M-032)
CSO 1: Target
Fabrication (unavailable pending review)
CSO 2: Moving
Cryostat Transfer Cart
CSO 3: Tritium
Fill Station Room Temperature Fill
CSO 4: Tritium
Fill Station Startup & Shutdown
CSO 5: DT High-Pressure System-1 (Obsolete DD fill procedure.
Superceeded by CSO 12)
CSO 6: High-Pressure
System-2
CSO 7:
Fill/Transfer Station-1
CSO 8: Fill/Transfer
Station-2
CSO 9: DT
Target Transfer Operations
CSO 10: DD
Target Transfer Operations
CSO 11: Characterization
Station
CSO 12: High
Pressure DT Fill
CSO 13: Room
157 Tritium Removal System
CSO 14: Cart
Maintenance Room
This page will retrieve the current release of the listed documents. List updated 15 April 2008
Address document comments, questions, and corrections to the LLE Lead System Engineer.