OMEGA Laser Facility > Documentation > Volume III Subsystem and Component Maintenance > Section 4 OMEGA Control System
OMEGA System Operations Manual - Volume III -- Subsystem and Component Maintenance (S-AA-M-014)
Front
Matter - Maintenance Index & Schedules - S-OM-P-029
Control System Procedures:
S-SM-P-225 Replace PLC Backup Batteries
S-SM-P-226 Reprogram Neuron Module
S-SM-P-227 Check and Balance Video Inputs
S-SM-P-228 Laser Bay Structure Grounding
S-SM-P-229 Laser Bay Non-Amp Structure Grounding
S-SM-P-230 Target Bay Non-Amp Structure Grounding
S-SM-P-231 Target Chamber, TMS, Fiducial Grounding
S-SM-P-232 750 KVA Controls (Dump Buttons)
S-SM-P-233 Warning Signs
S-SM-P-234 Facility Door Interlocks
S-SM-P-235 Check Charge Warning Bells & Beacons
S-SM-P-236 Test All OMEGA Public Address Zones
S-SM-P-237 Test All OMEGA AFCs
S-SM-P-238 Inspect CAMAC Crate Filters
Hardware Timing System Procedures:
S-SM-P-239 Rate Regenerator Module Replacement
S-SM-P-240 Diagnostic Rate Check
S-SM-P-241 Digital Fan-Out Unit Replacement
This page last updated on 10 June 2008
Address document comments, questions, and corrections to the LLE Lead System Engineer.