OMEGA Laser Facility > Documentation > Volume III Subsystem and Component Maintenance > Section 2 Laser Amplifiers
OMEGA System Operations Manual - Volume III -- Subsystem and Component Maintenance (S-AA-M-014)
Front
Matter - Maintenance Index & Schedules - S-OM-P-027
Rod Amplifier Procedures:
S-SM-P-162: Rod Amplifier Inspection
S-SM-P-163: Remove/Replace Tube Extender
S-SM-P-164 Remove/Replace Camshaft Assembly
S-SM-P-165 Remove/Replace Trigger Module
S-SM-P-166 Rod Module Replacement
S-SM-P-167 Replace Rod Module "O"-Rings
S-SM-P-168 Replace Rod Jacket
S-SM-P-169 Remove/Replace Rod Pump Modules
S-SM-P-170 Inspect Rod Face
Single Segment Amplifier Procedures:
S-SM-P-171 SSA Mechanical Inspection
S-SM-P-172 Replace SSA
S-SM-P-173 Replace Pump Module Window
S-SM-P-174 E & F Amplifier Windows
S-SM-P-175 Replace Flashlamp Brick
S-SM-P-176 Replace/Refurbish SDIP
S-SM-P-177 Replace Disk Frame Assembly
S-SM-P-178 SSA Disk Cleaning
S-SM-P-179 Clean Stage E & F Proteus
S-SM-P-180 Clean New SSA Pump Module Windows
S-SM-P-181 SSA Laser Disk Inspection
S-SM-P-182 Inspect Structure & Crane/Winch Assemblies
Cooling System Procedures:
S-SM-P-183 DI Polishing Skid
S-SM-P-184 Main DI Pumps
S-SM-P-185 Change DI Filters
S-SM-P-186 Check DI Water Flow Balance
S-SM-P-187 Check Spare DI Water Pump
S-SM-P-188 Test DI Water Check Valves
S-SM-P-191 Check Glycol Flow Balance
S-SM-P-192 Check Spare Glycol Pump
Nitrogen Purge Subsystem Procedures:
S-SM-P-193 Remove and Replace Particulate Filters
Lift Platform Procedures:
S-SM-P-194 Work Platform
This page last updated on 10 June 2008
Address document comments, questions, and corrections to the LLE Lead System Engineer.