OMEGA EP Media Gallery > Building Construction Time Lapse Movies
Time-lapse presentation of the OMEGA EP construction site.
Time-lapse movie of the concrete pour for the OMEGA EP laser bay floor. On 25 March 2004, 1963 cubic yards (approx. 8,000,000 lbs. (~1500 cubic metres; approx. 3,600,000 kg) of concrete was poured in a single day. |

