LLE > Around the Lab > Past Issues


Inner and intermediate shrouds for the new moving cryostat
November 2009:
LLE's Mechanical Engineering Group
Student with photoconductor
July 2009:
New X-Ray Detectors for the OMEGA Laser System
MRS
April 2009:
The OMEGA Magnetic Recoil Spectrometer
The Publications and Design Department
February 2009:
The Publications and Design Department at LLE
LLE employee in Laser Bay
November 2008:
Contamination-Resistant Sol-Gel Technology
2008 Summer High School Program Participants
September 2008:
2008 Summer High School Research Program
TVS2
July 2008:
New Target Viewing System (TVS2) Installed
Target Shot
May 2008:
OMEGA EP
Laser Dedication
Cryogenic target
March 2008:
Performance and Capabilities of the CFTF
MIFEDS
August 2007:
Magneto-Inertial
Fusion
Target shot
June 2007:
The LLE Completes Two NIC Level-2 Milestones
Rui Wang and her advisors
April 2007:
LLE High School Program Participants Honored
Target shot
January 2007:
2006
Year in Review
PEPC
December 2006:
LLE Builds Large Aperture Pockels Cell Drivers
Target shot
October 2006:
LLE Achieves Cryogenic Target Milestone
ROSS Streak Camera
June 2006:
The ROSS
Streak Camera
Kids touring OMEGA
April 2006:
Kids @ Work Day
2006
Robert L. Sproull
May 2005:
Robert L. Sproull
Center Dedicated
Kids touring OMEGA
April 2005:
April 28, 2005:
Kids at Work Day
Bruce Brewington and Steve Craxton
April 2005:
More Than a
Summer Job
Kids at work
September 2004:
Kids at
Work Day
Cryogenic Target Characterization
March 2004:
Cryogenic Target Characterization
2004 Summer HS Students
February 2004:
Summer High School Program
Tiled grating
October 2003:
Tiled
Gratings
Amplifier group
June 2003:
OMEGA EP
Amplifier
Kids at work
May 2003:
Kids @
Work Day
Phoebe Rounds and frequency-conversion crystals
April 2003:
Phoebe Rounds

OMEGA EP
March 2003:
OMEGA EP
Project
2002 Summer HS students
February 2003:
Summer High School Program
Comparison of images from x-ray pinhole camera to images from x-ray microscope
January 2003:
2002 Year in
Review
Liquid crystal image
December 2002:
Liquid Crystals

A planar cryogenic target assembly
November 2002:
Planar Cryo Target Positioner
A view of the mirror assembly after the mid-shield has been loaded.
September 2002:
Deformable Mirror Assembly
Explaining microhardness testing
August 2002:
COM
Summer School
 The MCTC, containing a layered target, is pulled away from the Characterization Station
June 2002:
Moving the
MCTC
Inner and intermediate shrouds for the new moving cryostat
LLE's Mechanical Engineering Group

The Mechanical Engineering Group provides a full range of mechanical design, engineering, fabrication, assembly, and testing capabilities. They specialize in designing, fabricating, and constructing unique and precise components and structures and are staffed by 26 full-time employees and 5 students. Shown above are the inner and intermediate shrouds for the new moving cryostat developed by the Mechanical Engineering group.

Posted November 2009